The City of Dover issued RFP 24‑0009EL for the preparation of the foundation at the Garrison Oak Substation. After the bid opening on November 16 2023, the contract was awarded to AUI Power, a private construction firm based in Elkton, MD. The work likely involves site clearing, grading, excavation, soil stabilization, and the installation of footings and concrete pads required before substation equipment can be erected. The procurement was conducted through an open competition, and the award details are captured in the vendor submission list.
• Scope: Foundation preparation for an electrical substation (site clearing, grading, excavation, footings, concrete pads).
• Awarded Vendor: AUI Power (contact: Markus Anderson).
• Procurement Method: Full and open competition with a single award.
• Location: Garrison Oak Substation area within the City of Dover, Delaware.