Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Education RFPsEducation Bids and Bidding Guide
More education bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Education
  5. ›50+ TON WATER CHILLER

Awarded contract·Florida State University (FSU)·Florida

50+ TON WATER CHILLER

Won by Parker Services$200kSingle Award
Contract source

Awarded vendors

  • Parker Services

Description

The contract is for the procurement, delivery, installation, and commissioning of a 50+ Ton water chiller equipment for Florida State University's FSU-CAPS test facilities High Bay building. The contract was awarded to Parker Services, and the solicitation number is ITN 5823-3. The key aspects of the contract include the scope of work, which involves the installation and commissioning of the water chiller equipment. The contract also outlines the protest procedure, which involves filing a protest with the Chief Procurement Officer. • The contract is for a 50+ Ton water chiller equipment • The equipment will be installed at the FSU-CAPS test facilities High Bay building • The contract was awarded to Parker Services • The solicitation number is ITN 5823-3 • The contract outlines the protest procedure, which involves filing a protest with the Chief Procurement Officer

Attached files

Key dates

Starts
10/24/2016

Last updated

Details

Award type
Single Award
Industry
Education
NAICS
333415
Solicitation №
ITN 5823-3

Contract value

$200,000

The contract value cannot be determined directly from the provided text, but based on the scope of work, which involves the procurement, delivery, installation, and commissioning of a 50+ Ton water chiller equipment, a rough estimate can be made. A 50+ Ton water chiller equipment can cost anywhere between $50,000 to $200,000 or more, depending on the specifications and features. Considering the installation and commissioning costs, the total contract value could be in the range of $100,000 to $500,000 or more. However, without more specific information, it's difficult to provide a more accurate estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

University of Missouri-Kansas City·Missouri

Top match · 67%

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Trident Technical College·South Carolina

67% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

University of South Carolina·South Carolina

66% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

66% match

CHILLER

Closes 11/2/2026Opened 10/2/2026

UCLA Capital Programs·California

66% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·North Carolina

65% match

RENTAL OF TWO CHILLERS FOR ONE YEAR

Closes 11/10/2026Opened 10/20/2026

Rapides Parish Sheriff's Office·Louisiana

65% match

Addendum #1 100 TON AIR COOLED CHILLER DC3 CORRECTIONS

Closes 11/12/2026Opened 10/2/2026

Trident Technical College·South Carolina

65% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Town of Arlington·Massachusetts

64% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

U.S. Department Of Defense·Pennsylvania

64% match

CHILLER

Closes 11/2/2026Opened 10/1/2026

University of Massachusetts·Massachusetts

64% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

University of South Carolina·South Carolina

63% match

Chiller and Infrastructure Replacement- North E #2

Closes 11/4/2026Opened 9/26/2026

South Carolina Natural Resources·South Carolina

63% match

INSPECT & PREVENTATIVE MAINT ON CHILLERS

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Defense·North Carolina

63% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·Utah

63% match

FD2020-23-00059

Closes 11/8/2027Opened 12/30/2022

U.S. Department Of Veterans Affairs·Texas

62% match

CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION

Closes 12/8/2026Opened 10/30/2026

City of Philadelphia·Pennsylvania

62% match

PW Prequalification Bid 6634 PHL 1675-14 Satellite Thermal Plant Chiller & Cooling Tower Upgrades

Closes 11/5/2026Opened 10/5/2026

Louisiana Grambling State University·Louisiana

62% match

(50) HEAT PUMP FAN COIL UNITS

Closes 11/5/2026Opened 10/15/2026

City of Philadelphia·Pennsylvania

62% match

PW PQ Bid 6703 PHL 1675-16 Satellite Thermal Plant Chiller & Cooling Tower Upgrades - Mechanical

Closes 11/5/2026Opened 10/5/2026

University of North Dakota·North Dakota

62% match

FM365 UND Abbot Chiller

Closes 11/17/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

62% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

City of Flagstaff, AZ·Arizona

62% match

Jay Lively Ice Chiller Replacement and Maintenance Project

Closes 11/12/2026Opened 10/15/2026

Washington Enterprise Services (DES), Dept. of·Washington

62% match

Wenatchee Valley College- Batjer Chiller Replacement

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Defense·Mississippi

62% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

University of North Dakota·North Dakota

61% match

UND Abbott Hall Chiller

Closes 11/17/2026Opened 10/20/2026