This contract covers the rehabilitation and partial replacement of a structurally deficient bridge on Greenwich Road between 117th and 125th Streets North in Wichita, Kansas. The scope includes bridge demolition, concrete and steel repairs, deck resurfacing, asphalt paving, grading, guardrail installation, pavement marking, and seeding of vegetation. The project was procured via a sealed‑bid competitive process (RFB #21‑0086) with a submission deadline of 1:45 p.m. on February 8 2022. After public opening and evaluation, the low bid of $605,088.24 submitted by Mies Construction, Inc. was accepted by the Board of County Commissioners on March 2 2022. No bid bond was required, and the award consists of a single lump‑sum contract.
• Location: Greenwich Road bridge, Wichita, KS (B507)
• Scope: bridge demolition, structural repairs, asphalt surfacing, grading, guardrail, pavement marking, seeding
• Procurement: Full and open competition, sealed bids, single award to Mies Construction, Inc.
• Value: $605,088.24 (award) with engineer’s estimate $755,359.60
• Key contacts: Ginger Cullen (Sedgwick County Public Works) – (316) 660‑1771