The contract is for vehicular and pedestrian traffic mitigation at VIA Metropolitan Transit's Transit Center located next to North Star Mall. The work consists of demolishing concrete, new excavation, placing top soil, and pouring curbs, sidewalks, and a ramp. The contract was awarded to E Z Bel Construction, LLC for a total price of $91,283.99. The project has a DBE goal of 19%.
• The project involves traffic mitigation at a transit center
• The work includes demolition, excavation, and construction of curbs, sidewalks, and a ramp
• The contract was awarded to E Z Bel Construction, LLC
• The total price of the contract is $91,283.99
• The project has a DBE goal of 19%