The City of Vancouver is seeking proposals from a Prime Consultant (architect/engineer) and a General Contractor to jointly deliver the replacement of Firehall 2 and Firehall 9 using an Integrated Project Delivery (IPD) approach. The selected parties will form an IPD team with the City, sign a modified CCDC‑30 IPD contract, and complete a Validation Phase to confirm design, schedule, constructability, and cost before moving into detailed design, procurement, and construction. The project budget ceiling is $28 million CAD per firehall, with an emphasis on sustainability, accelerated schedule, low‑maintenance facilities, and strong community communication.
• Scope includes full design, engineering, construction, and commissioning of two new fire‑rescue stations in Vancouver.
• Delivery method is IPD – collaborative, target‑cost, profit‑pool model under CCDC‑30 2025.
• Mandatory requirements: $40 M CAD bonding capacity for General Contractors, proof of 10 years continuous operation, five recent Vancouver projects, insurance, and a detailed open‑book cost breakdown.
• Key dates: posting/open 27 Apr 2026; bid submission sealed 14 May 2026 3:00 PM PDT.
• Evaluation will weight technical capability (≈80 %) and cost (≈20 %), with additional consideration for supplier equity, fair‑wage compliance, and conflict‑of‑interest disclosures.