Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›RFQ 2025-0042 Airport Terminal Seating

Georgia Savannah Airport Commission·Georgia

RFQ 2025-0042 Airport Terminal Seating

Closes 11/12/2025$500k – $1.5MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Savannah Airport Commission is seeking a certified Herman Miller distributor to provide and install terminal seating in the concourse area of the Savannah/Hilton Head International Airport. The selected vendor will furnish all materials, equipment, labor, and supervision required to deliver and install Herman Miller-brand terminal seating. The scope of work includes the procurement, delivery, assembly, and installation of seating units that meet all applicable airport, safety, and accessibility standards. Key requirements include: 577 hold room seats, including 552 standard seatbacks and 25 ADA-embroidered seatbacks, with integrated power modules and secure, climate-controlled storage. The vendor must also provide a proposed project timeline and coordinate with designated SAC personnel to ensure proper installation and functionality. • Total seating requirement: 577 hold room seats • Seatbacks: 552 standard, 25 ADA-embroidered • Power supply requirements: integrated power modules for each seating unit • Storage: secure, climate-controlled storage for seating units if concourse area is not ready for installation • Installation: assembly and installation of seating units in accordance with manufacturer guidelines and SAC layout • Quality assurance: final walkthrough with SAC representatives to confirm proper installation and functionality

Attached files

Contact

Christy Dixon(Purchasing Manager)

[email protected]

(912) 655-4666

Key dates

Opened
10/9/2025
Questions due
10/23/2025
Closes
11/12/2025
Projected award
12/17/2025

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
337
Solicitation №
RFQ 2025-0042

Budget estimate

$500,000 – $1,500,000

The budget for this opportunity is estimated to be between $500,000 and $1,500,000, based on the scope of work, which includes the procurement, delivery, assembly, and installation of 577 hold room seats, including 552 standard seatbacks and 25 ADA-embroidered seatbacks, with integrated power modules and secure, climate-controlled storage. The actual budget may vary depending on factors such as the complexity of the installation, the cost of materials and labor, and the vendor's pricing.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of St. Louis·Missouri

Top match · 70%

RFQ - Professional Services for Lindbergh Tunnel Inspection and Documentation for Year 2027 at St. Louis Lambert International Airport

Closes 11/12/2026Opened 10/22/2026

Capital Region Airport Commission·Virginia

69% match

RFP 27-1005 – Richmond International Airport Concessions Collections – Food, Beverage and Retail

Closes 2/2/2027Opened 10/8/2026

City of St. Louis Board of Public Service·Missouri

69% match

RFQ - Professional Services for Lindbergh Tunnel Inspection and Documentation for Year 2027 at St. Louis Lambert International Airport

Closes 11/12/2026Opened 10/22/2026

San Francisco International Airport·California

68% match

Terminal 3 East Video Game Lounge Lease

Closes 11/24/2026Opened 11/17/2026

City of Lynchburg·Virginia

67% match

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City and County of San Francisco·California

67% match

EXT AIR | RFQ 50455 As-Needed Catering Services

Rolling / TBD closeOpened 3/25/2026

San Francisco International Airport·California

67% match

RFQ 50379 As-Needed Airport Conveyance Maintenance and Repair Services

Closes 6/30/2029Opened 4/25/2024

Colusa County·California

67% match

RFP - Commercial Airport Property Lease

Closes 1/11/2027Opened 9/24/2026

Georgia Savannah Airport Commission·Georgia

67% match

RFQ 2026-0038 2027 Landside Facilities, Airfield & Engineering Safety Eyewear

Closes 11/2/2026Opened 10/23/2026

San Francisco International Airport·California

66% match

Terminal 3 Boarding Area E Travel Convenience Store Lease, a Small Business Set-Aside

Closes 11/18/2026Opened 6/5/2026

U.S. Department Of Homeland Security·North Carolina

66% match

Pilot Seats

Closes 11/20/2026Opened 9/14/2026

San Francisco International Airport·California

66% match

Private Terminal Ground Lease

Closes 1/27/2027Opened 5/20/2026

County of Colusa·California

66% match

RFP - Commercial Airport Property Lease

Closes 1/11/2027Opened 9/24/2026

NYS Niagara Frontier Transportation Authority·New York

66% match

BNIA – TERMINAL RECONSTRUCTION – INTERIOR

Closes 11/25/2026Opened 10/20/2026

Port of Portland·Oregon

65% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Lynchburg·Virginia

64% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

Sanford Airport Authority·Florida

64% match

Taxicab Concession Services

Closes 11/4/2026Opened 10/5/2026

City and County of San Francisco·California

64% match

EXT AIR | Private Terminal Ground Lease

Closes 1/27/2027Opened 5/20/2026

City of Redding·California

64% match

5733 - Redding Municipal Airport Rental Car Concession

Closes 11/5/2026Opened 10/2/2026

City of Mankato·Kansas

64% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Hillsborough County Aviation Authority·Florida

64% match

Parking Facilities Management Services

Closes 11/23/2026Opened 10/28/2026

Town of Leesburg·Virginia

64% match

RFQ No 320830-FY27-15 Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

City of Charlotte·North Carolina

64% match

RFP AVIA 26-13 CLT Internet Circuits

Rolling / TBD closeOpened 4/21/2026

San Francisco County·California

64% match

EXT AIR | As-Needed Airport Conveyance Maintenance

Closes 6/30/2029Opened 4/30/2024

Virgin Islands Port Authority·U.S. Virgin Islands

63% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026