The Fayette County Board of Commissioners is seeking a qualified contractor to evaluate and determine the suitability of various sites for solar installation. The contractor will design, build, operate, maintain, and decommission a solar photovoltaic system on the selected sites. The contract term is expected to be 20-30 years, with an initial term starting upon issuance of a Notice to Proceed and continuing through June 30, 2027. The contractor will be required to provide a plan for full decommissioning of each solar system at the end of its useful life.
• The contractor will evaluate one to three pilot sites for feasibility of placement of solar arrays and systems.
• The contractor will own and operate the system and sell energy output to the County at a fixed rate per kWh.
• The contractor will be required to provide construction performance and payment bonds, operation and maintenance performance bonds, and decommissioning bonds.
• The contractor will be responsible for site evaluations, design, installation, operation, maintenance, and decommissioning of the solar systems.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.