The Tompkins Cortland Community College is seeking bids for the TC3 Fieldhouse Wall Project. The project involves the removal and installation of a drainage system, washing and repointing of the CMU and concrete wall, and installation of a watertight membrane. The project requires the contractor to provide all labor, equipment, and materials. The contract term is approximately 6 months, from January 3, 2026, to July 31, 2026. The contractor must comply with the prevailing wage rate and provide certified payrolls to the College.
Key features of the project include:
• Removal and installation of the drainage system on the entire East side of the fieldhouse
• Washing and repointing of the CMU and concrete wall
• Installation of a watertight membrane and protection board below grade
• Backfilling with drainage stone and hauling spoils
• Sealing the CMU wall
• Compliance with the prevailing wage rate and provision of certified payrolls to the College
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.