Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Northside Splashpad

City of St. Joseph·Missouri

Northside Splashpad

Closes 10/29/2026$600k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of St. Joseph, Missouri is soliciting sealed, electronic bids for the design‑build construction of a new public splashpad at the Northside Complex. The project will be awarded on a lump‑sum basis, requires a 5 % bid security, performance and payment bonds, and mandates that the prime contractor self‑perform at least 51 % of the work. A mandatory pre‑bid conference is scheduled, and all bidders must comply with prevailing wage Order 33, OSHA‑type safety training, and federal equal‑opportunity requirements. Substantial completion is required by 17 Sep 2027 and final completion by 30 Sep 2027, with liquidated damages for delays. • Scope: site preparation, concrete work, water‑feature plumbing, electrical, lighting, safety surfacing, and associated landscaping. • Contract type: Lump‑sum construction bid; bid security 5 % of total bid. • Mandatory pre‑bid meeting: 13 Oct 2026 (attendance required). • Minimum self‑performance: 51 % of the work by the prime contractor. • Prevailing wage: Missouri Wage Order 33. • Required bonds: Performance & Maintenance Bond, Payment Bond. • Completion schedule: Substantial 17 Sep 2027, Final 30 Sep 2027. • Penalties: $500/day (substantial) and $1,000/day (final) liquidated damages. • Safety: 10‑hour OSHA‑approved construction safety training for all on‑site workers. • Special needs accommodation contact: Summer Deatherage (816‑271‑5330).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kim Eaton

Key dates

Opened
10/2/2026
Questions due
10/21/2026
Pre-bid meeting
10/13/2026Mandatory
Closes
10/29/2026
Duration
1 year

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
27-002 Addendum 2

Budget estimate

$600,000 – $1,200,000

Based on typical municipal splashpad projects of comparable size (approximately 10,000–15,000 sq ft of concrete and water‑feature work) and the requirement for extensive MEP, site work, and high‑quality finishes, the contract value is estimated between $600,000 and $1,200,000. The lower end assumes a modest design with basic finishes; the higher end reflects premium materials, extensive lighting/security systems, and the 51 % self‑performance labor requirement. Local labor rates, prevailing wage Order 33, and bond/security costs also influence the final figure.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland National Capital Park and Planning Commission·Maryland

Top match · 58%

Design Build for New Glen Dale Splash Project

Closes 11/16/2026Opened 9/30/2026

City of Northfield·Minnesota

56% match

Northfield, City of Skateboard Park Phase 2 26X.143028

Closes 11/4/2026Opened 10/16/2026

Kenai Peninsula Borough·Alaska

56% match

North Peninsula Recreation Service Area Pool – New Well (ITB27‑013)

Closes 11/5/2026Opened 10/20/2026

Village of North Palm Beach·Florida

55% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026

City of Syracuse·New York

55% match

BID HOMER WHEATON PARK - NEW SPLASH PAD AND CONCESSION STAND

Closes 11/24/2026Opened 10/29/2026

City of Lake Elsinore·California

55% match

Modular Floating Platforms

Closes 12/1/2026Opened 9/23/2026

City of Dublin, OH·Ohio

55% match

Ballantrae Park – Splash Ground Renovations

Closes 11/2/2026Opened 10/12/2026

City of Vista·California

55% match

Wave Waterpark Restroom Remodel Project

Closes 11/17/2026Opened 10/27/2026

City of North Charleston·South Carolina

55% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of North Charleston·South Carolina

54% match

Northwood Estates Pond Improvements

Closes 11/17/2026Opened 10/2/2026

James City County·Virginia

54% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

NYS Northland Associates, Inc.·New York

54% match

Tupper Arts Adirondack State Theater Renovation - Tupper Lake, NY

Closes 11/20/2026Opened 10/19/2026

City of North Charleston·South Carolina

54% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

Georgia City of Brookhaven·Georgia

53% match

RFP 26-113 Aquatic Maintenance Services - 2027

Closes 12/4/2026Opened 10/30/2026

City of Tampa·Florida

53% match

Mobile Water Bars

Closes 11/3/2026Opened 10/23/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

53% match

North Shore Regional 911 Call Center Water Leaks Renovation

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·South Dakota

53% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Connecticut City of Stamford·Connecticut

53% match

City RFP - Design Services for Northrop Park Improvements

Closes 11/5/2026Opened 10/8/2026

Connecticut Town of Westport·Connecticut

53% match

Compo Marina Piers - Utility Platform

Closes 11/19/2026Opened 10/23/2026

City of Frostproof·Florida

53% match

Clinch Lake Boat Ramp

Closes 12/3/2026Opened 10/26/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

53% match

North Shore Regional 911 Call Center Water Leaks

Closes 11/20/2026Opened 10/7/2026

NYS PRIDE of Ticonderoga·New York

53% match

Residential Wastewater Service Laterals and Septic Infrastructure

Closes 11/20/2026Opened 10/29/2026

Town of Eatonville·Florida

53% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

New York City Department of Environmental Protection·New York

52% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

California Grants·California

52% match

Division of Boating and Waterways Local Assistance Pumpout/Dump Station/Floating Restroom Operation and Maintenance Grant FY26

Closes 6/30/2027Opened 6/29/2026