Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Water and Wastewater
  5. ›1-Time Purchase & Installation of Insertion Flow Meters

San Antonio Water System·Texas

1-Time Purchase & Installation of Insertion Flow Meters

Closes 4/28/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The San Antonio Water System is soliciting bids for the purchase and installation of insertion flow meters. The scope of work includes furnishing the goods, supplies, equipment, and/or services as set forth in the solicitation. A non-mandatory pre-bid conference and site visit will be held on April 21, 2026, to clarify any questions pertaining to the specifications. Bidders are encouraged to prepare and submit their questions in writing three calendar days in advance of the pre-bid conference. • The bid must be received electronically or by sealed bid in the Purchasing Office by the specified date and time. • The bid must be enclosed in a sealed envelope, addressed to the Director Purchasing, and have the bid number, bid name, closing date, and company name clearly marked on the outside of the envelope. • The period of acceptance of this bid will be 90 calendar days after the bid opening date. • The San Antonio Water System Purchasing Department is willing to assist any bidder(s) in the interpretation of bid provisions or explanation of how bid forms are to be completed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Stephen Muniz(Purchasing Department)

[email protected]

(210) 233-2950

Key dates

Opened
4/14/2026
Questions due
4/22/2026
Pre-bid meeting
4/21/2026
Site visit
4/21/2026
Closes
4/28/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
26-26051

Budget estimate

$100,000 – $500,000

The budget for this opportunity is difficult to estimate without more specific information about the scope of work and the number of insertion flow meters to be installed. However, based on industry standards, the cost of insertion flow meters can range from $5,000 to $50,000 or more per unit, depending on the complexity of the installation and the equipment required. If we assume an average cost of $20,000 per unit and a total of 10 units to be installed, the total budget could be in the range of $200,000. However, this is a rough estimate and the actual budget could be higher or lower, depending on the specific requirements of the project. Factors that may influence the likely payment range include the complexity of the installation, the type and quality of the equipment required, and the level of competition among bidders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Phoenix·Arizona

Top match · 69%

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Arlington County Government·Virginia

69% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Charlotte·North Carolina

67% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Connecticut Metropolitan District Commission·Connecticut

67% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

NYS Rockland County·New York

67% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

University of South Carolina·South Carolina

67% match

Flow Meter by YSI, INC

Closes 12/12/2026Opened 12/8/2025

The Metropolitan Water District of Southern California·California

66% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

Michigan

65% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

The Metropolitan District·Connecticut

65% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

The Ohio State University·Ohio

65% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Rural Community Water District of Georgetown County·South Carolina

65% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

City of Aumsville·Oregon

65% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

Atlantic County Utilities Authority, NJ·New Jersey

64% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Bedford, TX·Texas

64% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

LA County Internal Services Department·California

63% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

City of Pasadena·California

63% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

LA Water & Power·California

63% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

City of Boca Raton·Florida

63% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Boca Raton·Florida

63% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

63% match

FLUXMETER

Closes 11/27/2026Opened 10/28/2026

City of Punta Gorda·Florida

62% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

U.S. Department Of Homeland Security·Maryland

62% match

USCG Yard: Sensors and Meters

Closes 11/6/2026Opened 10/30/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

62% match

Meter Exchange Services

Closes 11/30/2026Opened 10/26/2026

LA General Services·California

62% match

FLOWMETER, ELECTROMAGNETIC, MFR: ABB

Closes 11/3/2026Opened 10/28/2026

City of Seattle·Washington

62% match

Small Single & Multi-Jet Cold Water Meters

Closes 11/18/2026Opened 9/30/2026