Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Energy and Utilities
  5. ›Installation of Two Electric Vehicle Charging Stations

City of Ames·Iowa

Installation of Two Electric Vehicle Charging Stations

Closes 3/5/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Ames is seeking a qualified contractor to install two Level 2 Electric Vehicle (EV) charging stations and related buried electrical lines and equipment at the City of Ames Water Treatment Plant. The scope of work includes providing and installing conduits, in-ground pull boxes, elevated concrete foundations, circuit breakers, wires, and protective bollards. The contractor shall also activate and test the EV charging stations. The project requires the contractor to supply all labor, tools, equipment, and materials, unless otherwise noted. The city will provide the EV charging stations and concrete mounting kits. The project is expected to start on or about March 16, 2026, and be completed by May 29, 2026. Some key points to consider are: • The contractor must be a certified installer of ChargePoint EV charging stations. • The contractor shall conduct their operations in a manner that all soil is confined within the project limits and prevented from entering storm sewers, water courses, rivers, lakes, reservoirs, or wetlands. • The contractor shall maintain safety fencing around work areas to ensure the safety of the general public and passersby. • The contractor shall provide a trash container on site and dispose of waste daily.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jill Burt(Procurement Specialist I)

[email protected]

(515) 239-5126

Key dates

Opened
2/13/2026
Questions due
2/26/2026
Closes
3/5/2026
Duration
74 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
237910
Solicitation №
2026-016

Budget estimate

$200,000 – $500,000

Based on the scope of work, the estimated budget for this project could be in the range of $200,000 to $500,000. This estimate is based on the cost of materials, labor, and equipment required for the installation of two electric vehicle charging stations and related buried electrical lines and equipment. The actual budget may vary depending on the contractor's bid and the city's budget. Factors that may influence the budget include the complexity of the project, the availability of materials and labor, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Energy & Environmental Protection·Connecticut

Top match · 75%

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

City of Tamarac·Florida

73% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Department of Education·South Carolina

70% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

County of Sonoma·California

69% match

RFQ On-Call Electric Vehicle Charging Station

Closes 11/6/2026Opened 9/24/2026

City of Cincinnati·Ohio

69% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

SC Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

Wyoming Department of Transportation·Wyoming

68% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

NYS Rockland County·New York

68% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

City of Pinole·California

68% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

New York State Energy Research and Development Authority·New York

68% match

Charge Ready NY 2.0

Closes 12/31/2026Opened 7/8/2025

Maryland Department Of General Services·Maryland

67% match

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026

City of Cincinnati·Ohio

67% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/19/2026

SC Department of Education·South Carolina

67% match

Electric Bus Charging Stations - Union - Electrical

Closes 11/5/2026Opened 10/13/2026

SC Department of Education·South Carolina

67% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

California Department of State Hospitals·California

66% match

IFB 26-42015-000 Electric Vehicle Charging Stations Maintenance and Repair Services

Closes 11/6/2026Opened 10/21/2026

Lee County·Florida

66% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

City of Long Beach·California

66% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

Lee County·Florida

66% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026