Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Vermont
  4. ›Civil Engineering
  5. ›BUILDING REPAIR AND FLOOD RESILIENCY

City of Montpelier·Vermont

BUILDING REPAIR AND FLOOD RESILIENCY

Rolling / TBD close
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Montpelier, Vermont invites qualified professional services (architecture and engineering) firms to develop plans to repair and incorporate building resiliency for flood damage to three (3) City owned properties caused by the July 10, 2023 flood event (DR-4720). The focus of this work will be to provide alterative options and cost estimates to retrofit, renovate, and mitigate future damage within historic buildings. All repairs will be to bring the buildings back to pre-flood condition, meet flood hazard mitigation standards, and provide options to prevent future events. The successful bidder shall furnish all tools, labor, materials services, insurance, notifications, and licenses/certificates. SCOPE OF WORK: The scope of work for this project is to evaluate and provide flood resilient options for significantly damaged City buildings. Successful bidders will demonstrate three “alternatives” of work along with specialized studies (i.e., hydrological study, historic preservation, and architectural design): Repair and return to pre-flood condition:The consultant shall provide an itemized list of all work and associated costs to restore City Hall, the Fire Station and the Police Department buildings to the condition they were in before the flood. Elevate critical equipment, wet proofing areas below the Design Flood Elevation (DFE) and relocation of basement offices: The consultant shall provide an itemized list to elevate all critical equipment a minimum of two feet (2ft) above the base flood elevation (DFE) and the estimated costs of the constructing new office space for the displaced offices within City Hall and the Fire Station.Assumptions: Elevated critical infrastructure will be placed on the first floor on eastern side of the building referred to as the Memorial Room for the purposes of estimating. Four displaced public works offices will be constructed within the cold storage space at the public works garage and the eight planning and community justice offices will be constructed within the memorial room / City Council Chambers. Three displaced offices within the Fire Station will be relocated to the training room on the 2nd floor. Consultant will provide a recommendation and estimates for the most cost-effective alternatives to protect the City Hall boilers and the emergency backup generator from future flooding damage. Alternatives may include but are not limited to elevating equipment, flood proofing the rooms where the equipment is housed, or constructing an elevated addition on the building. Repair, mitigate, and improve the existing facilities. The consultant will provide a preliminary analysis on the feasibility of flood proofing each of the three buildings. Analysis should include establishment of the DFE, capacity of the existing building walls to withstand hydrostatic forces, evaluation of modifications to existing windows below the DFE to withstand hydrostatic forces, flood gates, evaluating entryways, and structural modifications to prevent flood waters from entering the buildings. DELIVERABLES: Provide separate itemized cost estimates for the three alternatives, along with a narrative describing the approach to each alternative.Provide preliminary layout plans for proposed office space relocations described in alternative 2 as well as preliminary layout plans for any proposed additions.Provide narrative on barriers to construction alternatives associated with historic preservation or potential permits.Provide a recommendation on the preferred approach to reconstructing each building. The following buildings included in this evaluation are (including building age and square footage): City Hall – 39 Main Street (built in 1909; 40,040 SF) – Damage was sustained to the main level, Finance Office, and to the lower level of City Hall. The elevator, heating, plumbing, electrical service and generator were significantly damaged. Fire Station – 61 Main Street (built in 1924; 12,003 SF) – The main level and basement were significantly damaged along with the walkway entrance to the basement. Police Department – 1 Pitkin Court (built in 2000; 10,276 SF) – The basement and communication infrastructure were damaged.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
9/28/2023
Closes
Rolling / TBD

Last updated

Details

Industry
Civil Engineering
NAICS
541310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department of Homeland Security - FEMA·United States of America

Top match · 79%

Fiscal Year 2024 Flood Mitigation Assistance Swift Current

Closes 12/30/2026Opened 5/30/2024

U.S. Department of Homeland Security - FEMA·United States of America

77% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

U.S. Department of Homeland Security - FEMA·United States of America

74% match

Fiscal Year 2026 Flood Mitigation Assistance Swift Current

Closes 1/31/2028Opened 7/14/2026

U.S. Department of Homeland Security - FEMA·United States of America

74% match

Fiscal Year 2024 & 2025 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 3/25/2026

Town of Munster·Indiana

74% match

RFQ Tornado and Water Damage Restoration and Reconstruction

Closes 11/11/2026Opened 10/29/2026

Sterling Heights·Michigan

73% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

U.S. Department of Homeland Security - FEMA·United States of America

72% match

Fiscal Year 2026 Flood Mitigation Assistance

Closes 2/26/2027Opened 10/22/2026

California Grants·California

72% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

New York City Department of Design and Construction·New York

72% match

CONSTRUCTION SERVICES FOR PROPOSED EAST SIDE COAST RESILIENCY PROJECT (ESCR)

Rolling / TBD closeOpened 6/7/2019

Illinois Emergency Management Agency·Illinois

71% match

FFY 2022 Flood Mitigation Assistance

Rolling / TBD closeOpened 5/1/2026

U.S. Economic Development Administration·United States of America

71% match

FY 2023 Disaster Supplemental

Rolling / TBD closeOpened 4/24/2023

County of Volusia·Florida

71% match

CDBG-DR SMA Healthcare Ridgewood Flood Mitigation Construction

Closes 12/31/2026Opened 8/14/2026

New York City Department of Design and Construction·New York

71% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

U.S. Department Of The Interior·Utah

71% match

F--Post-Flood Cleanup and Disaster AbatementSand Is

Closes 11/4/2026Opened 10/30/2026

New York City Department of Design and Construction·New York

71% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

North Carolina City of Asheville·North Carolina

71% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

Department of Buildings & General Services·Vermont

71% match

Groton State Forest Beaver Depot Flood Repairs

Closes 11/5/2026Opened 10/7/2026

City of Canton·Georgia

70% match

Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater

Closes 12/11/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

LA County Public Works·California

70% match

On-Call Emergency Facilities Repair Services Program for Stormwater Maintenance Division

Closes 11/4/2026Opened 9/23/2026

City of Charlotte·North Carolina

70% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Waterbury·Connecticut

70% match

Emergency & On-Call Roofing Services

Closes 11/3/2026Opened 10/16/2026

Frisco ISD·Texas

70% match

Roofing Repair, Maintenance, and Waterproofing

Closes 12/4/2026Opened 9/25/2026

City of Coronado·California

70% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026