Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Repair Chilled Water Lines - Amendment 0002

U.S. Department Of Defense·Illinois

Repair Chilled Water Lines - Amendment 0002

Closes 8/11/2026$50k – $200kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Army Contracting Command - Rock Island (ACC-RI) is requesting a quote for the repair of chilled water pipes from building 108 to building 114 at the US Army Garrison. The solicitation includes an amendment that requires offerors to sign and return the final solicitation document with their quote submission. • The project involves repairing chilled water pipes between two buildings. • The solicitation includes an amendment with changes to the original document. • Offerors must acknowledge receipt of the amendment prior to the hour and date specified in the solicitation. • The project is located at the US Army Garrison.

Attached files

Contact

Detric Ross(Contract Specialist)

[email protected]

(520) 715-1204

Key dates

Opened
6/29/2026
Questions due
8/3/2026
Pre-bid meeting
7/27/2026
Closes
8/11/2026
Duration
150 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
W519TC26QA162

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work, which involves repairing chilled water pipes between two buildings. The cost of materials and labor for such a project can vary depending on the location, size of the pipes, and complexity of the work. However, a rough estimate for a project of this nature could be between $50,000 and $200,000, considering the costs of pipe replacement, labor, and potential additional work such as inspections and testing. Factors that may influence the likely payment range include the size of the pipes, the distance between the buildings, and the need for any additional work such as excavations or repairs to surrounding structures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Veterans Affairs·Massachusetts

Top match · 72%

Amendment 0001- Replacement-in-Kind Repair of Existing Perimeter Security Fence (Ameristar Impasse Trident) Brand Name or Equal

Closes 11/13/2026Opened 10/28/2026

State of Michigan·Michigan

71% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

Alaska Department of Environmental Conservation·Alaska

70% match

University of Alaska Southeast Water Line Improvements Categorical Exclusion Determination

Rolling / TBD closeOpened 10/9/2026

City of Ontario·California

70% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Gloucester County·Virginia

68% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/16/2026Opened 10/9/2026

Alabama Bill Nichols State Veterans Home·Alabama

68% match

Nichols Hot Water Line Repair

Closes 11/5/2026Opened 10/28/2026

New York City Department of Design and Construction·New York

68% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

LA County Internal Services Department·California

68% match

937043 REPAIR CORROSION ON CHILLER END BELLS

Closes 11/6/2026Opened 10/16/2026

City of Salina·Kansas

68% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

Oregon Department of Administrative Services·Oregon

68% match

HVAC Water Treatment - Hot/Cold Water Systems Services for DAS-Owned Buildings

Closes 11/3/2026Opened 8/6/2026

City of Rockford·Illinois

68% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Goodwyn Mills Cawood·Georgia

67% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Austin Energy (City of Austin)·Texas

67% match

2026 IDIQ Chilled Water Construction In The ROW Reissue

Rolling / TBD closeOpened 8/31/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

City of Rockford·Illinois

67% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

U.S. Department Of Veterans Affairs·Pennsylvania

67% match

Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634)

Closes 11/13/2026Opened 5/19/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

U.S. Department Of Agriculture·Utah

67% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

67% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Rockford·Illinois

67% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Asheville·North Carolina

67% match

Request for Formal Bids for Water Line Repair for Wood Ave and Misc. Insulation Replacement (Federally Funded)

Closes 11/5/2026Opened 10/1/2026

Utility Board of the City of Key West·Florida

67% match

Specifications for Line 9 Marker Ball and Static Line Repair

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Energy·California

67% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

Connecticut Town of Waterford·Connecticut

67% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026