• Demolish and remove existing AC units, exhaust fan, ductwork, lighting, and drop ceiling.
• Supply and install two split‑system air‑conditioning units, concrete equipment pad, supply/exhaust fans, filter box, louver, and full ductwork.
• Install new drop ceiling, lighting, HVAC controls, and required power/electrical work.
• Perform start‑up, testing, commissioning, and training; replace any damaged sod, sidewalk, or pavement.
• Provide all permits, insurance, bonds, and comply with E‑Verify; project duration 330 calendar days.