Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Construction
  5. ›WTRBA Trace Creek

State of Tennessee·Tennessee

WTRBA Trace Creek

Closes 4/24/2026$250k – $400kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of Tennessee, through the West Tennessee River Basin Authority, is seeking a qualified contractor to remove a concrete‑encased abandoned sanitary sewer line that forms a low‑head dam on Trace Creek near Waverly, and to restore the stream corridor. The contract is a one‑time, fixed‑price award with a maximum liability ceiling of $400,000. Work must begin no later than June 8 2026 and be completed within roughly six weeks of mobilization, subject to weather extensions. The contractor must hold a valid Tennessee contractor’s license (if bid exceeds $25k), provide required bonds, insurance, and comply with extensive state and federal regulations (Buy‑America, Iran Divestment Act, anti‑immigration, etc.). • Remove the concrete dam and cut‑cap the abandoned sewer pipe. • Construct temporary haul road, coffer‑dam, and in‑stream access structures. • Perform stream‑bed and bank stabilization, rip‑rap installation, erosion‑control measures, and vegetative restoration (live‑stake brush, tree planting). • Provide all labor, equipment, materials, permits, and documentation; submit a detailed schedule within 10 days of contract award and hold a pre‑construction meeting before work starts.

Attached files

Contact

Josh Polk(Procurement Contact)

[email protected]

(615) 360-4460

Key dates

Opened
3/25/2026
Questions due
4/7/2026
Pre-bid meeting
4/2/2026
Closes
4/24/2026
Duration
30 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
32701-13840

Budget estimate

$250,000 – $400,000

The solicitation notes a maximum liability ceiling of $400,000 and indicates the contract will be awarded to the lowest‑cost responsive bidder. Comparable dam‑removal and stream‑restoration projects of this size in Tennessee typically range from $250k to $400k, depending on material quantities, mobilization distance, and bonding/insurance costs. Assuming a mid‑range bid, the contractor could expect to earn roughly $300k‑$400k in total contract value, with profit margins of 5‑10% after expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cobb County·Georgia

Top match · 59%

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Santa Clara Valley Water District·California

56% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

Mississippi MS Department of Finance and Administration·Mississippi

56% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

Minnesota Department of Administration·Minnesota

56% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

California Grants·California

55% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

California Grants·California

54% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

County of Chester·Pennsylvania

54% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026

City of Goshen, Indiana·Indiana

54% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Alaska Department of Transportation & Public Facilities·Alaska

54% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

St. Louis County, MN - Purchasing Division·Minnesota

54% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

Mississippi Department of Finance and Administration·Mississippi

54% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

California Grants·California

54% match

San Joaquin River Conservancy

Rolling / TBD closeOpened 6/6/2025

Iowa Department of Transportation·Iowa

54% match

1035.00 Credits of Stream Mitigation- Jones County

Closes 11/2/2026Opened 10/7/2026

Georgia Cobb County Department of Transportation·Georgia

54% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

California Grants·California

53% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

Catawba Regional Council of Governments·South Carolina

53% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Laramie Rivers Conservation District·Wyoming

53% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Illinois Natural Resources·Illinois

53% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

City of Middletown·Connecticut

53% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Shawnee·Kansas

53% match

Ordinance No. 3523

Closes 6/3/2033Opened 6/3/2025

Illinois Natural Resources·Illinois

53% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

California Grants·California

53% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

City of Charlotte·North Carolina

53% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

U.S. Department Of Defense·Florida

53% match

Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)

Closes 11/11/2026Opened 10/27/2026

Kenosha County·Wisconsin

53% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026