Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Construction
  5. ›Ute Dam Outlet Works Modification Project

New Mexico Interstate Stream Commission·New Mexico

Ute Dam Outlet Works Modification Project

Closes 7/1/2026$5M – $15MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of New Mexico is seeking a qualified contractor to perform a comprehensive modification of the Ute Dam outlet works. The work includes civil‑structural repairs, installation of a new bypass pipeline, extensive underwater and electrical work, coating/painting, and full commissioning of the system to meet dam‑safety requirements. The contractor must provide all required engineering sub‑mittals, safety plans, and operate under a single‑award construction contract. • Mobilization, site restoration, and access‑road maintenance. • Underwater bulkhead repair, installation of a new bypass system (pipes, valves, actuators, flowmeter). • Electrical upgrades, wiring, control panel replacement, and grounding. • Pipe inspection, lining/coating repairs, and full commissioning/testing. • Detailed documentation, O&M manuals, and compliance with OSHA, EPA, and New Mexico dam‑safety regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Maria Lugo‑Mee(Procurement Manager)

[email protected]

(505) 412-7965

Key dates

Opened
5/21/2026
Questions due
6/10/2026
Pre-bid meeting
6/1/2026Mandatory
Site visit
6/17/2026
Closes
7/1/2026
Duration
336 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237120
Solicitation №
61-55000-26-01208

Budget estimate

$5,000,000 – $15,000,000

Based on typical dam‑outlet modification and water‑infrastructure projects of this scale, the contract value is likely to fall between $5 million and $15 million. The range reflects variability in site conditions, underwater work complexity, material costs for steel piping and actuators, and the extensive testing/commissioning effort required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Kentucky

Top match · 70%

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Farmington·New Mexico

70% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

68% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Grand River Dam Authority - GRDA·Oklahoma

68% match

Tonnece 69 kV Terminal Addition Project - Substation & Transmission

Closes 11/20/2026Opened 10/26/2026

City of Farmington·New Mexico

67% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Gwinnett County Government·Georgia

67% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

67% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

Navajo Nation·Arizona

67% match

Proposal for the Tohatchi Diversion Project

Closes 11/20/2026Opened 9/16/2026

Inland Empire Utilities Agency·California

66% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

Ohio Department of Natural Resources·Ohio

66% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

U.S. Department Of Agriculture·Utah

66% match

GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

Closes 11/20/2026Opened 10/5/2026

Lower Platte North Natural Resources District·Nebraska

66% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

65% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

Idaho Transportation Department·Idaho

65% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Riverton City·Utah

65% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

U.S. Department Of The Interior·Utah

65% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

City of Thornton·Colorado

65% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

NYS Cambria, Town of·New York

65% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·Connecticut

65% match

Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT

Closes 11/5/2026Opened 10/13/2026

Laramie Rivers Conservation District·Wyoming

65% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

City of Grand Rapids Department of Engineering·Michigan

65% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

City of Keene·New Hampshire

65% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·Texas

65% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

Lower Platte North Natural Resources District·Nebraska

65% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026