The City of Spokane is seeking a prime/general contractor to execute Phase 2 of the Water Department Main Office renovation at 914 E North Foothills Dr. The scope includes demolition of existing structures, interior remodel, addition of new office space, mechanical, electrical, plumbing, and fire‑protection upgrades, as well as site work such as grading, utility relocation, and storm‑water management. The contract requires compliance with Washington prevailing‑wage and apprenticeship utilization rules, a $50,000 asbestos‑remediation allowance, and submission of a signed addendum package. Two major alternates (stone‑cap replacement and masonry restoration) and several unit‑price items (stone caps, concrete demolition, excavation, backfill) are included.
• General construction, demolition, and addition of municipal office building.
• Mechanical, electrical, plumbing, fire‑protection, and HVAC system extensions (including VRF and EV‑charging).
• Mandatory pre‑bid meeting, 5 % bid bond, extensive insurance, and apprenticeship utilization reporting.