The State of Tennessee is seeking a qualified electrical contractor to completely demolish and replace the existing electrical system at the Fiery Gizzard State Park Visitor Center. The work includes removal of existing panels, wiring, lighting, HVAC electrical connections, fire‑alarm devices, and associated finishes, followed by installation of new panels, conduit, wiring, lighting fixtures, control systems, grounding, and all required code‑compliant components. The contractor must hold an active Tennessee Building Contractor license, provide a 25 % payment bond for bids over $100 k, and meet Energy‑Star requirements. Work must be performed within a strict December 1 2026 – January 7 2027 window, with a mandatory pre‑bid meeting on August 6 2026 and a delivery deadline of August 22 2026.
• Complete demolition of the current electrical infrastructure and removal of debris.
• Installation of two new 200 A main panels, a 125 A load center, associated breakers, conduit, MC cable, lighting (LED troffers and track), HVAC and water‑heater circuits, fire‑alarm devices, and a 400 A manual transfer switch.
• Full compliance with NEC, IBC, NFPA standards, Energy‑Star certification, and Tennessee contractor licensing; includes one‑year workmanship warranty and manufacturer warranties for materials.