Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›J041--621-22-108 - Replace Site Underground Chilled Water…

U.S. Department Of Veterans Affairs·Tennessee

J041--621-22-108 - Replace Site Underground Chilled Water Piping - Pre-Solicitation

Closes 3/12/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves replacing site underground chilled water piping at the VA Medical Center in Tennessee. The work includes demolishing existing piping, installing new piping, and connecting it to existing chilled water lines. The project is divided into phases, and the contractor will be responsible for developing and implementing the phasing sequences. The project requires coordination with the owner and other stakeholders to ensure a smooth shutdown and re-establishment of chilled water flow to the buildings. • The project includes installing new 12" underground piping and flushing loops in the tunnel/storage room and B119 area. • The contractor must schedule chilled water shutdowns with the VA and other stakeholders. • The project requires demolishing existing pipe and connecting to new piping. • The contractor must open isolation valves and re-establish chilled water flow to the buildings.

Attached files

Contact

Robert Glenn(Contract Specialist)

[email protected]

(615) 225-3413

Key dates

Opened
1/15/2026
Closes
3/12/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
36C24926R0013

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be in the range of $500,000 to $2 million, based on the scope of work, which includes demolishing existing piping, installing new piping, and connecting it to existing chilled water lines. The project requires coordination with the owner and other stakeholders, which may add to the complexity and cost of the project. The estimated budget range is also influenced by the fact that the project is a construction project at a medical center, which may have specific requirements and regulations that need to be followed.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

State of Michigan·Michigan

Top match · 75%

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

Massachusetts Dracut Water Supply District·Massachusetts

72% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Veterans Affairs·Delaware

72% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

State of Michigan Department of Technology, Management and Budget·Michigan

71% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

Austin Energy (City of Austin)·Texas

71% match

2026 IDIQ Chilled Water Construction In The ROW Reissue

Rolling / TBD closeOpened 8/31/2026

City of Ontario·California

71% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

NYS OGS Design & Construction - Construction Contractors·New York

70% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

U.S. Department Of The Interior·Massachusetts

70% match

41--Remove and Replace Walkin Cooler and Freezer

Closes 11/5/2026Opened 10/16/2026

NYS OGS Design & Construction - Construction Contractors·New York

70% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

City of Edgewater, FL·Florida

70% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Agriculture·Utah

70% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

U.S. Department Of Defense·Mississippi

70% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

The Metropolitan Water District of Southern California·California

70% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

Connecticut UConn Health Center·Connecticut

70% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

City of Camden·South Carolina

70% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

City of DeLand·Florida

70% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

University of Missouri-Kansas City·Missouri

70% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

State of Michigan Department of Technology, Management and Budget – State Facilities Administration, Design and Construction Division·Michigan

70% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/29/2026

University of Massachusetts System·Massachusetts

70% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

State University of New York (SUNY)·New York

70% match

Chiller/Boiler Upgrades Johnson City Center - Mechanical & Plumbing

Closes 11/12/2026Opened 10/21/2026

City of Rockford·Illinois

70% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

70% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Goodwyn Mills Cawood·Georgia

70% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Bristol Virginia Utilities Authority·Virginia

70% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

NYS OGS Design & Construction - Construction Contractors·New York

70% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026