The US Air Force is seeking a contractor to upgrade the Uninterruptible Power and Cooling Distribution Unit at the Wyoming Air National Guard. The contractor will be responsible for uninstalling the outdated equipment and installing brand-new items according to acceptable standards. The contractor will also provide a Site Lead/Project Manager to support the Wyoming Air National Guard. The scope of work includes capturing existing cooling fluid, demoing existing piping, running new Pex piping to the in-row coolers, furnishing and installing new 350A shut trip breakers, and more.
• Capture existing cooling fluid/Re-fill system with cooling fluid.
• Demo existing piping
• Run new Pex piping to the in-row coolers.
• Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
• Tie existing EPO into new Shunt Trip breaker.
• Existing 3” Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS.
• Demo existing UPS, remove from Data Center, Dispose/recycle old UPS.
• Install Power Modules and Battery Cabinets
• Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others.