Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Water System Upgrades Santa Fe National Forest

U.S. Department Of Agriculture·New Mexico

Water System Upgrades Santa Fe National Forest

Closes 12/17/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the replacement of three drinking water systems at the Jacks Creek Campground, Field Tract Campground, and Panchuela Administrative site in the Santa Fe National Forest. The contractor will be responsible for excavating and removing contaminated soil, installing new water lines, and constructing new pump houses and other facilities. The project requires the contractor to coordinate with the Mora-San Miguel Electric Coop for the installation of underground electrical lines. The contractor will also be responsible for providing a single point of contact for the project and ensuring that all work is completed within the specified timeframe. Some key aspects of the project include: • Excavation and removal of contaminated soil • Installation of new water lines and pump houses • Construction of new facilities, including pump houses and restrooms • Coordination with the Mora-San Miguel Electric Coop for underground electrical lines • Provision of a single point of contact for the project • Completion of all work within the specified timeframe of 180 days

Attached files

Contact

Blaine Greenwalt

[email protected]

Key dates

Opened
12/9/2025
Pre-bid meeting
12/2/2025
Site visit
12/2/2025
Closes
12/17/2025
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
127EAX26R0004

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated, but based on the scope of work, it is likely to be in the range of $500,000 to $2 million. The project involves the replacement of three drinking water systems, construction of new facilities, and excavation and removal of contaminated soil, which are all significant tasks that require specialized labor and equipment. The contractor will also need to coordinate with the Mora-San Miguel Electric Coop, which may add to the overall cost. However, without more detailed information on the materials and labor required, it is difficult to provide a more precise estimate. The budget may be influenced by factors such as the cost of materials, labor costs, and the complexity of the project. The contractor will need to provide a firm-fixed-price for the work, which will include all costs associated with the project, including labor, materials, and equipment. The estimated budget range is $500,000 to $2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Agriculture·New Mexico

Top match · 67%

Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF

Closes 11/6/2026Opened 10/8/2026

Citrus County - Board of County Commissioners·Florida

67% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

U.S. Department Of Agriculture·Utah

67% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

U.S. Department Of The Interior·California

66% match

CA-SAN LUIS NWR-FIRE SYSTEM REHAB

Closes 11/30/2026Opened 10/29/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

U.S. Department Of Agriculture·South Dakota

65% match

GAOA Grizzly Bear Campground

Closes 11/5/2026Opened 10/8/2026

U.S. Forest Service·United States of America

65% match

Landscape Scale Restoration Grant Program for Non-Federal Lands

Closes 1/26/2027Opened 10/28/2026

City of Holly Grove·Arkansas

65% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

U.S. Department Of Agriculture·District of Columbia

65% match

New Mexico Forest Engineering and Road Maintenance (FERM)

Closes 1/31/2028Opened 2/13/2023

U.S. Department Of The Interior·New Mexico

65% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

California Grants·California

64% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

Santa Maria-Bonita School District·California

64% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

U.S. Department Of Agriculture·Wyoming

64% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 11/17/2026Opened 9/30/2026

New Mexico General Services Department·New Mexico

64% match

INSTALLATION AND SERVICE OF WATER SYSTEMS

Closes 11/10/2026Opened 10/1/2026

City of Vallejo·California

64% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

Alaska Division of Community and Regional Affairs·Alaska

64% match

National Forest Receipts

Rolling / TBD closeOpened 12/5/2024

California Grants·California

64% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

California Grants·California

63% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

California Grants·California

63% match

Prop 4 – Nature-Based Solutions (NBS)

Rolling / TBD closeOpened 6/8/2026

California Grants·California

63% match

Forest Conservation

Rolling / TBD closeOpened 6/18/2025

Eastern Municipal Water District·California

63% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

St. Helena Parish Police Jury·Louisiana

63% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

U.S. Forest Service·United States of America

63% match

Landscape Scale Restoration Grant Program for Tribes

Closes 1/26/2027Opened 10/28/2026

U.S. Department Of Agriculture·North Carolina

63% match

Oconaluftee Waterline Replacement

Closes 11/13/2026Opened 10/6/2026

U.S. Department Of The Interior·Hawaii

63% match

Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment

Closes 11/6/2026Opened 10/13/2026