The Missoula County Detention Facility requires a comprehensive upgrade of its cooling system, including demolition of existing equipment, installation of a new water‑cooled chiller, groundwater well system, heat exchangers, pumps, and associated electrical and control work. The project is budgeted at approximately $1 million for the core scope with an optional $550 k alternate. It is a fixed‑price, public‑works contract subject to prevailing‑wage and bonding requirements.
• Demolition of existing cooling tower, chiller, boiler, pumps, and related piping.
• Installation of new water‑cooled chiller (270 tons), chilled‑water pump, heat‑exchanger packages, and a groundwater supply/injection well system with directional‑drilled piping.
• Full mechanical, electrical, and control systems integration, including VFDs, DDC/PLC, and testing & balancing.
• Required bid bond (10 % of bid), performance bond, GRT, and compliance with Montana prevailing‑wage and resident‑preference policies.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.