Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Replacement Central Section Sump Pumps for Hoover

U.S. Department Of The Interior·Nevada

Replacement Central Section Sump Pumps for Hoover

Closes 8/5/2026$70k – $300kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Reclamation is seeking quotes for the replacement of two central section sump pumps at Hoover Dam. The pumps must be interchangeable with the currently installed sump pumps and have specific characteristics, including a 16HH single stage vertical turbine pump assembly, a 1.5" head shaft assembly, and a 2300 V, 3 phase, 60 Hz, 150 HP motor. The pumps must also meet certain performance requirements, including a flow rate of 5000 GPM and a head of 60 ft. The contractor will be responsible for supplying the pump assemblies, and the government will install them. The delivery of the pumps is expected to be completed within approximately 6 months of the date of award. • The pumps must be interchangeable with the currently installed sump pumps. • The pumps must have specific characteristics, including a 16HH single stage vertical turbine pump assembly and a 2300 V, 3 phase, 60 Hz, 150 HP motor. • The pumps must meet certain performance requirements, including a flow rate of 5000 GPM and a head of 60 ft. • The contractor will be responsible for supplying the pump assemblies. • The government will install the pumps. • The delivery of the pumps is expected to be completed within approximately 6 months of the date of award.

Attached files

Contact

Noah Maye(Point of Contact)

[email protected]

(702) 293-8095

Key dates

Opened
3/19/2026
Questions due
7/30/2026
Closes
8/5/2026
Duration
6 months

Last updated

Details

Type
Request for Quotation
Industry
Energy and Utilities
NAICS
333914
Solicitation №
140R3026Q0054

Budget estimate

$70,000 – $300,000

The budget for this opportunity can be estimated based on the cost of the pumps and the installation. The cost of two high-quality sump pumps with the specified characteristics can range from $50,000 to $200,000, depending on the manufacturer and the specific features. Additionally, the cost of installation, including labor and materials, can range from $20,000 to $100,000. Therefore, the total budget for this opportunity can be estimated to be between $70,000 and $300,000. The factors that may influence the likely payment range include the complexity of the installation, the cost of materials, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Branson·Missouri

Top match · 66%

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Metropolitan Council·Minnesota

65% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Justice·Indiana

64% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

64% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

North Carolina City of Raleigh·North Carolina

64% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

U.S. Department Of Defense·Oregon

64% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

Louisiana Southern University and A&M College·Louisiana

64% match

Boiler and Pump Replacement

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/24/2026

U.S. Department Of Veterans Affairs·California

64% match

Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps

Closes 11/3/2026Opened 10/27/2026

City of Redding·California

63% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

63% match

PUMP UNIT,CENTRIFUG

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Tennessee

62% match

Diesel Powered Trash Pump

Closes 11/13/2026Opened 10/27/2026

Upper Occoquan Service Authority·Virginia

62% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

U.S. Department Of Defense·Ohio

62% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

Town of Tyrone·Georgia

62% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

Hampton Roads Sanitation District·Virginia

62% match

408395 - Digester Transfer Pump Parts

Closes 11/5/2026Opened 10/27/2026

City of Worcester·Massachusetts

62% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Justice·Illinois

62% match

Replace Water Tanks FCI Marion Marions, Illinois

Closes 11/30/2026Opened 10/29/2026

Illinois DOC - Corrections·Illinois

61% match

replace/repair fire pump drive engine and inspect/repair fire pump

Closes 11/9/2026Opened 10/26/2026

Hawaii Department of Defense·Hawaii

61% match

Installation of new replacement backflow preventor assembly, to include all necessary plumbing parts

Closes 11/10/2026Opened 10/14/2026

The City of Columbus·Ohio

61% match

RFQ033960 - 6009-PAWP- Spare FCI Flow Switches

Closes 11/3/2026Opened 10/28/2026

City of Charlotte·North Carolina

61% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Parkland Health & Hospital System·Texas

61% match

IFB-1984049 - Boiler Refurbishment Services

Rolling / TBD closeOpened 1/1/2017

Gwinnett County Government·Georgia

61% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026