Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›26-0070 Kuehler River Crossing

New Braunfels Utilities·Texas

26-0070 Kuehler River Crossing

Closes 8/6/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Rio to Kuehler Water Line Construction project involves the construction of approximately 150 linear feet of 6-inch and 12-inch water main by open-cut, and 520 linear feet of 12-inch water main by horizontal directional drilling under the Guadalupe River. The project also includes the abandonment of the existing water main, connections to the NBU water system, storm water pollution prevention, restoration, and other appurtenances necessary to complete the project. The contractor will be responsible for conducting hydrostatic pressure testing of the installed polyethylene pipe, and for providing and maintaining sediment containment dikes to control erosion during construction. • The project requires the contractor to excavate and backfill trenches, lay pipe, and connect to the existing water system. • The contractor must also provide and maintain sediment containment dikes to control erosion during construction. • The project includes the abandonment of the existing water main, which must be cut and plugged in a manner satisfactory to NBU. • The contractor will be responsible for conducting hydrostatic pressure testing of the installed polyethylene pipe. • The project requires the contractor to restore the site to its original condition, including seeding and mulching, after completion of construction.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michelle Mowen(Engineer of record)

[email protected]

(830) 608-8747

Key dates

Opened
7/2/2026
Questions due
7/27/2026
Closes
8/6/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110

Budget estimate

$500,000 – $2,000,000

Based on the scope of work, which includes the construction of approximately 670 linear feet of water main, the estimated budget for this project could be in the range of $500,000 to $2,000,000. This estimate takes into account the cost of materials, labor, and equipment required for the project, as well as the need for specialized services such as hydrostatic pressure testing and sediment containment. However, the actual budget could vary depending on factors such as the complexity of the project, the number of bidders, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of San Antonio·Texas

Top match · 61%

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Delaware Valley Regional Planning Commission·Pennsylvania

60% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

Pittsburgh Regional Transit·Pennsylvania

59% match

Q261179 (Highway Crossing Gate Mechanism)

Closes 11/17/2026Opened 10/29/2026

City of El Paso De Robles·California

59% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

NYS Niagara County·New York

59% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

California Department of Transportation·California

58% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Division of Highways·North Carolina

58% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

Virginia Department of Transportation·Virginia

58% match

B30_2027 ON-CALL BRIDGE MAINTENANCE

Closes 11/18/2026Opened 10/14/2026

Steuben County·New York

58% match

Prestressed Concrete Bridge Beams; BIN 3359510 B#07-06; CR 7 over Ten Mile Creek, Town of Prattsburg

Closes 11/10/2026Opened 10/15/2026

Delaware River Joint Toll Bridge Commission·New Jersey

58% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Meriden·Connecticut

58% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Shawnee County·Kansas

58% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

City of Cedar Rapids·Iowa

57% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Texas City of San Antonio·Texas

57% match

George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Oregon Clackamas County·Oregon

57% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

City of Indianapolis·Indiana

57% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

U.S. Department Of Defense·Louisiana

57% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

57% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 6-2026 (OM26006)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

57% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

City of Cedar Rapids·Iowa

57% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Daviess County·Missouri

57% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

City of Keene·New Hampshire

57% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

57% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

Washakie County Conservation District·Wyoming

57% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

57% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025