Construction of the new South Point Public Works Facility Operations Building and renovation of the existing Warm Storage Building for the Parks Division, encompassing extensive civil, structural, mechanical, electrical, and site‑work components. This public‑works contract requires compliance with Wisconsin best‑value contracting rules, a 5 % bid‑bond, and a 6 % Small Business Enterprise goal.
• New 13,000 sf pre‑engineered metal operations building with mezzanine, offices, vehicle bays, and wash stations.
• Remodeling of an existing warm‑storage building, including demolition, structural upgrades, and interior finishes.
• Comprehensive site work: grading, storm‑water basin, utility relocation (water, sewer, gas, electric), pavement, curb‑gutter, erosion control, and landscaping.
• Required coordination of multiple trades (concrete, steel, masonry, HVAC, plumbing, fire‑protection, electrical) and strict adherence to city codes, SBE goals, and bid‑bond requirements.