The Municipality of Skagway is awarding a contract to replace its existing solid‑waste incinerator facility. The scope includes complete demolition of the existing incinerator system and associated structures, civil site work, structural steel and metal‑building installation, new incinerator equipment (controlled‑air two‑stage system), conveyor and fuel‑oil systems, fire‑protection sprinkler system, complete electrical and low‑voltage distribution, HVAC and ventilation, plumbing, fire‑pump and jockey‑pump, and associated ancillary works such as a new restroom, water‑storage tank, and site‑improvement retaining walls. The project must comply with Alaska Davis‑Bacon prevailing‑wage rules, American Iron & Steel requirements, and DBE/MBE/WBE participation goals, with a final completion date of August 5 2027.
• Demolition of existing incinerator, chimney, conveyors, and related building components.
• Installation of a new controlled‑air two‑stage incinerator, fuel‑oil storage, conveyor system, and associated mechanical, electrical, and fire‑protection infrastructure.
• Structural and civil works including new retaining wall, re‑grading, ash‑field modifications, concrete slabs, and site utilities.
• Full compliance with prevailing‑wage, Buy‑America, and minority‑business participation requirements; liquidated damages of $1,500 per day for late completion.