Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Environmental Services
  5. ›Torrance Refinery Water Recycling Plant Microfiltration…

West Basin Municipal Water District·California

Torrance Refinery Water Recycling Plant Microfiltration Feasibility Study

Closes 2/26/2026$200k – $500kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The West Basin Municipal Water District is seeking a consultant to conduct a feasibility study for the replacement of the microfiltration system at the Torrance Refinery Water Recycling Plant. The study will evaluate various scenarios for replacing the existing system, increasing water production capacity, and potentially moving and installing West Basin's potable ultrafiltration system. The consultant will be required to provide professional engineering services, including a detailed scope of work, technical approach and methodology, and a price proposal. • The microfiltration system at the Torrance Refinery Water Recycling Plant was built in 1999 and consists of six units designed for a capacity of 3.73 MGD. • The system has experienced mechanical and equipment material degradation and failures, resulting in an inability to meet refinery product water demand. • The consultant will be required to evaluate various scenarios for replacing the existing system and provide a detailed scope of work, technical approach and methodology, and a price proposal. • The consultant will also be required to provide a project schedule and timeline, as well as identify and recommend any improvements or enhancements for the proposed service. • The District encourages the utilization of small and local businesses and has established a program to provide incentives for their participation in the competitive solicitation process.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tikneshea Hicks(Contracts Administrator II)

[email protected]

(310) 660-6207

Key dates

Opened
2/5/2026
Questions due
2/19/2026
Pre-bid meeting
2/17/2026
Closes
2/26/2026
Projected award
3/9/2026
Duration
90 days

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
RFP-TH-0117

Budget estimate

$200,000 – $500,000

Based on the scope of work and the requirements of the project, the estimated budget for this project could be in the range of $200,000 to $500,000. This estimate is based on the assumption that the consultant will be required to provide a detailed scope of work, technical approach and methodology, and a price proposal, and that the project will require a significant amount of time and resources to complete. The actual budget could be higher or lower, depending on the complexity of the project and the level of expertise required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Jupiter·Florida

Top match · 69%

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

West Basin Municipal Water·California

68% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

El Paso Water·Texas

68% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

U.S. Department Of Defense·California

68% match

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026

City of Ontario·California

68% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Corona·California

68% match

Microgrid Feasibility Study-Lester Water Treatment Plant and Chase Booster Station

Closes 11/23/2026Opened 10/22/2026

City of Hollywood·Florida

68% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Salisbury·Maryland

68% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

El Paso Water·Texas

67% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

West Basin Municipal Water District·California

67% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

El Paso Water·Texas

67% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

El Paso Water·Texas

67% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Washington Suburban Sanitary Commission, MD·Maryland

67% match

Request for Information WSSC Water Biosolids Market Research

Closes 11/30/2026Opened 10/28/2026

California Grants·California

67% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

Texas Tx Dept Crim. Justice/inst Div·Texas

67% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

Massachusetts Department of Environmental Protection·Massachusetts

66% match

DEP-BPE-RFR-2026-CERP-Wastewater Energy Recovery Pilot Grant (WWER) GRANT ANNOUNCEMENT ONLY

Closes 10/23/2028Opened 5/8/2026

California Grants·California

66% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

California Grants·California

66% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

Connecticut Northwest Hills Council of Gov.·Connecticut

66% match

Torrington Transfer Station: MSW & Recycling Management & Operations

Closes 12/15/2026Opened 11/4/2025

Maryland City of Salisbury·Maryland

66% match

RFP 27-105 Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/31/2026

East Bay Municipal Utility District·California

66% match

RFP - Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services

Closes 11/11/2026Opened 10/1/2026

New York City Department of Environmental Protection·New York

66% match

82627B0004-BEDC OB-144A: Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF)

Closes 11/18/2026Opened 10/7/2026

California Grants·California

66% match

Proposition 13 – Water Recycling – Planning Grant

Rolling / TBD closeOpened 6/4/2025