Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›E. Brewster Rd Pipe Repairs

St. Tammany Parish Government·Louisiana

E. Brewster Rd Pipe Repairs

Closes 9/17/2026$30k – $80kRequest for QuotationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Parish seeks a qualified contractor to perform drainage improvements on E. Brewster Rd in Covington, LA. The work involves removing tree roots, cleaning existing underground pipe, and installing a cured‑in‑place pipe (CIPP) liner to restore proper flow. The contractor must provide all labor, equipment, temporary traffic control, and insurance required for a highway‑street‑bridge construction project, and must meet a tight schedule—work must begin within 10 days of receiving the Notice to Proceed and be completed within 30 calendar days. The bid package includes a procurement package, addendum with an interior pipe video, and detailed insurance and bonding requirements. Key points: • Scope: Root removal, pipe cleaning, install 18‑in × 7‑in CIPP liner (≈338 linear feet). • Schedule: Quote due Sept 17 2026 (03:00 PM EDT); NTP within 20 days; work start ≤ 10 days after NTP; 30‑day completion window. • Requirements: Louisiana contractor’s license (if cost ≥ $50k), 100 % performance bond, extensive insurance (GL, workers’ comp, pollution, etc.), corporate resolution, and compliance with numerous statutes. • Financial: No price disclosed; liquidated‑damages, retainage, and monthly partial payments apply.

Attached files

Contact

[email protected]

(985) 898‑2520

Key dates

Opened
9/2/2026
Closes
9/17/2026
Duration
30 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
26-31-1

Budget estimate

$30,000 – $80,000

No contract value is disclosed, but based on typical costs for CIPP liner installation (≈ $60‑$200 per linear foot) plus mobilization, traffic control, and labor, the total contract price is likely in the $30,000‑$80,000 range. The estimate assumes 338 ft of liner, a mid‑range unit cost of $80/ft, plus $5‑$10 k for mobilization and signage, and a modest contractor profit margin.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 68%

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

City of Charlotte·North Carolina

68% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Waukegan·Illinois

67% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Newark Board of Education·New Jersey

67% match

10285 Boiler Tube Replacement Repair Patching and Caulking Services

Closes 11/19/2026Opened 10/29/2026

City of Charlotte·North Carolina

67% match

CTC Drainage Repairs

Rolling / TBD closeOpened 1/20/2026

City of Charlotte·North Carolina

66% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Western Virginia Water Authority·Virginia

66% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Erie County·New York

66% match

ERIE COUNTY SEWER DISTRICT NO. 1 FRENCH ROAD AT RANDY WAY SANITARY SEWER REPLACEMENT CONTRACT NO. 52

Closes 11/17/2026Opened 10/13/2026

Massachusetts Town of Westborough·Massachusetts

66% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

66% match

Unspecified Water and Sewer Repairs

Rolling / TBD closeOpened 12/5/2025

Goodwyn Mills Cawood·Georgia

66% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Massachusetts Town of Plymouth·Massachusetts

66% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of The Interior·Utah

66% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Eastern Municipal Water District·California

66% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Bellevue·Washington

66% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

North Carolina City of Asheville·North Carolina

66% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

Gary Sanitary District·Indiana

66% match

Request for Quotes Sanitary Sewer Repair 2708 Monroe Street

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·New Hampshire

65% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

Connecticut UConn Health Center·Connecticut

65% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

School District of Philadelphia (General Opportunities)·Pennsylvania

65% match

On Call Piping Repairs

Closes 1/12/2027Opened 10/30/2026

Gary Sanitary District·Indiana

65% match

REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway

Closes 11/19/2026Opened 10/29/2026

Newark Board of Education·New Jersey

65% match

Boiler Tube Replacement Repair Patching and Caulking Services

Closes 11/19/2026Opened 10/30/2026

Louisiana St. Tammany Parish Government·Louisiana

65% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

City of Charlotte·North Carolina

65% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

Massachusetts City of Haverhill·Massachusetts

65% match

South Mill Street Pump Station Header Piping Replacement

Closes 11/5/2026Opened 10/21/2026