Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›Lafourche Parish School Board-North Larose Elementary…

Lafourche Parish School Board·Louisiana

Lafourche Parish School Board-North Larose Elementary School Chilled and Hot Water Pipe Insulation Replacement

Closes 5/4/2026$200k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lafourche Parish School Board is soliciting sealed bids to replace the chilled and hot water pipe insulation at North Larose Elementary School. The contractor must provide a 5% bid bond, a 100% performance bond, and hold a current Louisiana Mechanical Construction license. Bids are to be submitted in sealed envelopes or electronically with a digital signature. The work must be completed within 91 calendar days from the notice to proceed, and the contractor is responsible for all shipping charges and must include no taxes in the bid price. • Scope: Remove existing pipe insulation and install new insulated piping for both chilled and hot water systems throughout the school facility. • Mandatory pre‑bid conference on 16 April 2026 at the school site; attendance required. • Bid security: minimum 5% of total bid amount (bond, certified or cashier’s check). • Performance bond: 100% of contract value required before issuance. • Licensing: Louisiana Contractor’s License – Mechanical Construction required.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
4/7/2026
Pre-bid meeting
4/16/2026Mandatory
Closes
5/4/2026
Duration
91 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
Sealed Bid: 40516979

Budget estimate

$200,000 – $500,000

Based on typical school‑wide pipe insulation projects of this scale, labor, material (high‑performance pipe insulation, sealants, removal of old insulation), equipment mobilization, and bonding requirements, the contract value is likely to fall between $200,000 and $500,000. The lower bound assumes minimal material waste and efficient labor; the upper bound accounts for higher material costs, potential site‑specific challenges, and the need for performance bonding.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 70%

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Santa Maria-Bonita School District·California

69% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Union Parish School Board·Louisiana

68% match

UNION PARISH HIGH SCHOOL 2026 WINTER STORM DAMAGE REPAIRS

Closes 11/10/2026Opened 10/8/2026

Rock Hill School District 3·South Carolina

68% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

Henrico County·Virginia

68% match

Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

Michigan L’Anse Creuse Public Schools Board of Education·Michigan

68% match

Roofing Replacement Bid

Closes 11/5/2026Opened 10/9/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Omaha Public Schools·Nebraska

67% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

Maryland Howard County Public Schools·Maryland

67% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

Maryland Saint Mary's County Public Schools·Maryland

67% match

Request for Qualifications and Invite to Prequalify to Bid for Greenview Knolls Elementary School VRF System Replacement

Closes 11/19/2026Opened 10/29/2026

Town of Arlington·Massachusetts

67% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

Jefferson County Public Schools·Kentucky

67% match

RFP 3200 - C/N for Walk-In Cooler/Freezer Units and Installation for Phase 45 Various Schools

Closes 11/17/2026Opened 10/23/2026

Henrico County Government·Virginia

66% match

ITB No. 26-2999-9EAR - Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

University of Missouri-Kansas City·Missouri

66% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Berkeley County School District·South Carolina

66% match

Howe Hall AIMS Elementary School Select Roof Replacement and Exterior Repair

Closes 11/20/2026Opened 10/28/2026

Omaha Public Schools·Nebraska

66% match

Heat Pump Maintenance Services

Closes 11/24/2026Opened 10/26/2026