Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Idaho guideIdaho Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Idaho
  4. ›Construction
  5. ›Boise Airport Terminal Building Reroof

City of Boise·Idaho

Boise Airport Terminal Building Reroof

Closes 4/15/2026$1.7M – $2.9MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Boise is seeking a qualified contractor to replace the roof membrane on the Boise Airport main terminal. The work consists of installing a mechanically‑attached 60‑mil fleece‑backed TPO roofing system as an overlay over the existing membrane, together with associated flashings, walk pads, protective coating, safety upgrades, and limited insulation replacement. Several optional alternates (guard‑rail fall barrier, various skylight replacements, and HVAC unit reset) and four allowance items (flashing, solar hot‑water piping, insulation replacement, and owner’s general contingency) are also included. Bids must be submitted electronically through JAGGAER, accompanied by a 5 % bid bond, and the contractor must hold an Idaho Public Works license. The contract will run for 184 consecutive calendar days after a May 1, 2026 start date. • Install 138,310 sf of 60‑mil TPO roofing overlay on the airport terminal roof. • Perform safety and access improvements: guard‑rail (optional), roof‑walking paths, protective coating of gas piping, and fall‑arrest anchor recertification. • Manage optional alternates (skylight replacements, HVAC reset) and budgeted allowances (up to $141,981). • Must comply with airport security, staging, and work‑hour restrictions; all permits and insurance required.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Suzannah Hitchcock(Purchasing Contact)

[email protected]

(208) 972-8683

Key dates

Opened
3/18/2026
Pre-bid meeting
3/31/2026Mandatory
Closes
4/15/2026
Duration
184 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238160
Solicitation №
FB-2026-033

Budget estimate

$1,700,000 – $2,900,000

Based on the base‑bid quantity of 138,310 sf of TPO membrane and typical market rates for commercial TPO overlay (approximately $12‑$20 per square foot), the core roofing work is likely to be valued between $1.66 M and $2.77 M. Adding the four allowance items ($141,981) and typical overhead/fee margins brings the total contract value into an estimated range of roughly $1.8 M to $2.9 M. This estimate assumes standard material costs, labor rates in Idaho, and no major scope changes.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Boise·Idaho

Top match · 70%

Boise Airport Vertical Transportation Equipment

Closes 11/4/2026Opened 10/7/2026

City of Boise·Idaho

68% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

City of Charlotte·North Carolina

65% match

Terminal Roof and AHU Replacements

Closes 1/1/2027Opened 8/12/2026

Franklin County Board of County Commissioners·Florida

65% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

NYS Niagara Frontier Transportation Authority·New York

65% match

BNIA – TERMINAL RECONSTRUCTION – INTERIOR

Closes 11/25/2026Opened 10/20/2026

Port of Portland·Oregon

64% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Houston Airport System·Texas

64% match

IAH Terminal D HVAC Efficiency Upgrades

Closes 11/12/2026Opened 9/11/2026

Texarkana Regional Airport·Arkansas

64% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

Port of Portland·Oregon

63% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of Boise·Idaho

63% match

BOI AOC Video Wall System

Closes 11/18/2026Opened 10/21/2026

Massachusetts Port Authority (Massport)·Massachusetts

63% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Port of Portland·Oregon

63% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Lynchburg·Virginia

62% match

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City of Lawrence·Massachusetts

62% match

New Administration Building Lawrence Municipal Airport Construction IFB

Closes 11/10/2026Opened 8/18/2026

City of Elko·Nevada

62% match

AIP 3-32-0005-064-2026 Rehabilitate Terminal Building Sidewalks- Re-Bid TBD

Rolling / TBD closeOpened 10/7/2026

San Francisco International Airport·California

62% match

Private Terminal Ground Lease

Closes 1/27/2027Opened 5/20/2026

Georgia State University·Georgia

62% match

GSU - RFQ Replace Terminal Units, Clarkston Building CH, Ground, 1st, and 2nd Floors

Closes 11/12/2026Opened 10/13/2026

City of Boise·Idaho

62% match

Boise Airport Central Utility Plant (CUP) Equipment

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

62% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

City of Bangor·Maine

61% match

P27-36 Curb Replacement BGR

Closes 11/18/2026Opened 10/23/2026

Idaho Transportation Department·Idaho

61% match

Key No. 24698 DISCOVERY WAY, US 20/26 TO BRIDGER ST, BOISE

Closes 11/10/2026Opened 10/14/2026

Ontonagon County Road Commission·Michigan

61% match

Ontonagon County Road Commission Bergland Garage No. 3 Building Repairs

Closes 11/10/2026Opened 10/17/2026

City of Charlotte·North Carolina

61% match

Baggage Handling System Control Room Relocation

Rolling / TBD closeOpened 6/2/2026

Hillsborough County Aviation Authority·Florida

61% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

Town of Payson·Arizona

61% match

Payson Municipal Airport Facility Development FY27

Closes 11/30/2026Opened 9/18/2026