Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington, DC
  4. ›Construction
  5. ›RFP - Drainage Pumping Stations - PHASE 2

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

RFP - Drainage Pumping Stations - PHASE 2

Closes 6/23/2026$15M – $30MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Washington Metropolitan Area Transit Authority (WMATA) is soliciting proposals for a Best Value Design-Build Contract for Drainage Pumping Stations at 6 Metro Stations. The scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. The project locations include Van Ness - UDC, Friendship Heights, Judiciary Square, Fort Totten (Lower Level), Gallery Place Chinatown (Lower Level), and Forest Glen (Montgomery County). The project is a federally funded design-build contract with a Small Business Enterprise (SBE) goal of 25%. The period of performance is 1,340 calendar days. • The project involves the design and construction of drainage pumping stations at six metro stations. • The contract type is design-build. • The SBE goal is 25%. • The period of performance is 1,340 calendar days. • The project is federally funded.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Margarita D. Rodriguez(Contract Administrator)

[email protected]

Key dates

Opened
3/11/2026
Closes
6/23/2026
Duration
1340 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
WMATA-0000010718

Budget estimate

$15,000,000 – $30,000,000

The budget for this project can be estimated based on the scope of work and the fact that it is a federally funded design-build contract. The total construction cost for a project like this can range from $10 million to $50 million, considering the number of locations and the complexity of the work. Since the SBE goal is 25%, the actual budget for the contractor may be lower. Assuming an average construction cost of $20 million and considering the SBE goal, the budget for the contractor could be in the range of $15 million to $30 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bakersfield·California

Top match · 72%

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Upper Occoquan Service Authority·Virginia

72% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of San Diego·California

72% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

Alabama State Port Authority·Alabama

71% match

RFQ/RFP-Upper Mobile Bay Beneficial Use Wetland Creation (Implementation) – Phase 1

Closes 11/6/2026Opened 9/22/2026

City of Coronado·California

71% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

County of Frederick, MD·Maryland

71% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

City of Tampa, Florida·Florida

71% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

City of Hollywood·Florida

71% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

City of Rosenberg·Texas

70% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

Tacoma·Washington

70% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 9/30/2026

North Carolina Cape Fear Public Utility Authority·North Carolina

70% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/8/2026

Maryland Frederick County Government·Maryland

70% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

Cape Fear Public Utility Authority·North Carolina

69% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/7/2026

Tarrant Regional Water District·Texas

69% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Oakland·California

69% match

RFP for Affordable Housing Development and Financial Consulting Services

Closes 12/3/2026Opened 10/30/2026

Town of Church Point·Louisiana

69% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

City of Key West·Florida

69% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

City of Branson·Missouri

69% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Tacoma·Washington

69% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 10/2/2026

U.S. Department Of The Interior·New Mexico

69% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Town of Ponce Inlet·Florida

69% match

RFQ 2026-02 - TOWN OF PONCE INLET COLLECTION SYSTEM IMPROVEMENTS PHASE 1

Closes 11/19/2026Opened 10/20/2026

East Bay Municipal Utility District·California

69% match

RFP - Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services

Closes 11/11/2026Opened 10/1/2026

El Paso Water·Texas

69% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Cincinnati·Ohio

69% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

U.S. Department Of Defense·Missouri

69% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026