Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Civil Engineering
  5. ›Preliminary Plans for Time Check and Riverfront Greenway…

City of Cedar Rapids·Iowa

Preliminary Plans for Time Check and Riverfront Greenway Parks

Closes 9/30/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cedar Rapids is seeking a qualified consulting firm to develop 30 % engineered design plans (preliminary plans) for Time Check Park and a segment of the Riverfront Greenway. The work includes reviewing existing studies, preparing preliminary engineering drawings, coordinating with the flood‑control consultant (HR Green), delivering an opinion of probable construction cost, recommending phasing, creating a permitting roadmap, and identifying funding opportunities. Deliverables are electronic and must follow state and city design manuals, as well as the Waterfront Edge Design Guidelines (WEDG). The consultant must include at least one WEDG associate on the team and attend a virtual pre‑proposal meeting on September 15, 2026. The contract will be awarded after electronic proposals are received by September 30, 2026, with a project schedule of roughly six months from notice to proceed. • Scope: 30 % design (preliminary plans) for park amenities, grading, utilities, and integration with flood‑control infrastructure. • Coordination: Work closely with HR Green (flood‑control) and City staff; provide data gap analysis, field review, and community engagement graphics. • Deliverables: Preliminary plans, cost opinion, phasing memo, permitting strategy, funding opportunities memo, and engagement materials. • Timeline: Proposals due 9/30/2026; project completion within 6 months after award. • Location: Cedar Rapids, Iowa (Time Check Park & Riverfront segment).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rebecca Johnson

[email protected]

(319) 286-5062

Key dates

Opened
8/27/2026
Questions due
9/16/2026
Pre-bid meeting
9/15/2026
Closes
9/30/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
PUR0826-045 Addendum 1

Budget estimate

$500,000 – $2,000,000

The solicitation does not disclose a contract value. A 30 % design effort for a multi‑million‑dollar park project typically ranges from $0.5 M to $2 M, depending on scope complexity, staffing, and required specialized expertise (e.g., WEDG certification, flood‑control coordination). Therefore, a reasonable estimate is between $500,000 and $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Green Cove Springs·Florida

Top match · 71%

City of Green Cove Springs - Parks Master Plan

Closes 11/5/2026Opened 10/1/2026

City of Green Cove Springs·Florida

69% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Illinois Natural Resources·Illinois

67% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Madison·Wisconsin

67% match

SAUK CREEK GREENWAY

Closes 1/28/2027Opened 1/28/2027

Camden County·New Jersey

67% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Santa Monica·California

67% match

Santa Monica Airport Measure A Planning & Pre-Design Park Project

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of The Interior·Colorado

66% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

County of Collier, FL·Florida

66% match

PARKS AND RECREATION MASTER PLAN

Closes 11/18/2026Opened 10/20/2026

City of Richmond·California

66% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Tampa-Hillsborough County Expressway Authority·Florida

66% match

P-0826 Parks Design Services

Closes 11/13/2026Opened 10/2/2026

Maryland Town of Port Deposit·Maryland

66% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

City of Lake Charles·Louisiana

65% match

Riverside Park Shoreline Protection – Phase One

Closes 11/17/2026Opened 10/22/2026

City of Brandon·Mississippi

65% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

New York City Department of Parks & Recreation·New York

65% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

Georgia City of Bloomingdale·Georgia

65% match

Taylor Park Improvements- Phase 1

Closes 11/30/2026Opened 10/30/2026

City of Danville·Virginia

65% match

IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements

Closes 11/17/2026Opened 10/27/2026

City of Shelbyville·Tennessee

65% match

Duck River Greenway Reconstruction & Scenic Overlook

Closes 11/12/2027Opened 9/29/2026

Pawtucket Municipality·Rhode Island

64% match

Tidewater Landing Phase 1 B Riverwalk East Contract 2 – Early Site Work

Closes 1/14/2027Opened 1/14/2027

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

64% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026