Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›FTA Pedestrian Walkway Connection Phase II Construction

City of Sierra Vista·Arizona

FTA Pedestrian Walkway Connection Phase II Construction

Closes 3/18/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Sierra Vista is seeking bids for the FTA Pedestrian Walkway Connection Phase II Construction project. The project involves the installation of public improvements, including sidewalks, curb and gutter, shared use paths, driveways, and lighting, at various locations around existing bus stops within the city. The project is partially funded by the Federal Transit Authority and is subject to all applicable federal requirements. The contract will be awarded to the lowest responsive and responsible bidder. The project requires compliance with Davis Bacon wages and the Buy America Act. Key aspects of the project include: • Construction of a new, ADA-compliant shared use path • Installation of ADA ramps, concrete sidewalk, curb and gutter, and concrete driveways • Asphalt paving and demolition work • Installation of permanent survey markers • Compliance with federal requirements, including Davis Bacon wages and the Buy America Act • Registration with the System for Award Management (SAM) is required for award of work on federally funded projects.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Angela Dixon(Chief Procurement Officer)

[email protected]

(520) 458-5775

Key dates

Opened
2/15/2026
Questions due
3/4/2026
Pre-bid meeting
2/25/2026
Closes
3/18/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
2026-IFB-032-TR087

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of sidewalks, curb and gutter, shared use paths, and lighting, which would require significant labor and material costs. Assuming an average cost per linear foot of sidewalk of $50, and an average cost per square foot of curb and gutter of $20, the total cost for these items alone would be substantial. Additionally, the cost of asphalt paving, demolition, and other work would add to the overall cost. Considering these factors, a rough estimate for the budget could be between $500,000 and $2,000,000. However, this is a wide range and the actual budget could be higher or lower, depending on the specifics of the project and the bids received.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Okaloosa·Florida

Top match · 69%

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Town of Bluffton·South Carolina

68% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

U.S. Department Of Transportation·Hawaii

67% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

State of Delaware DOT·Delaware

66% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of Foley·Alabama

66% match

CAFFM Sidewalk Additions

Closes 11/10/2026Opened 10/22/2026

City of Seattle·Washington

66% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

County of Sacramento·California

65% match

SMF Pedestrian Walkway - Riparian Public Art Installation Project

Closes 11/19/2026Opened 10/26/2026

City of Richmond Government·Virginia

65% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

NYS East Fishkill, Town of·New York

65% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Division of Highways·North Carolina

65% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of Charlotte·North Carolina

65% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Cobb County·Georgia

65% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Sacramento·California

65% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

LA Public Works Engineering Bureau·California

65% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Miami-Dade County·Florida

64% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Fort Myers·Florida

64% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

City of Gainesville - Procurement Division·Florida

64% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

LA Public Works Engineering Bureau·California

64% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Charlotte·North Carolina

64% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

BREC·Louisiana

64% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

64% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Municipality of Anchorage·Alaska

64% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

Florida Keys Aqueduct Authority·Florida

64% match

MARATHON HIGHWAY CROSSING IMPROVEMENTS, PHASE I

Closes 11/19/2026Opened 10/14/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

64% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

Town of Hilton Head Island·South Carolina

64% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026