Preferred Construction will be bidding for GC Contract Multiple Prime: PFAS Treatment at Wells 15 & 18 Goal Requirements for MWBE : 30% Goal Requirements for SDVOB : 06%
This is a Prevailing Wage Project – OSHA CARDS NEEDED
Requested by: Monday December 1
Insurance Coverage:
Commercial General Liability Insurance
$2,000,000 per Project$2,000,000 Products and Completed Operations$1,000,000 Personal and Advertising Injury$50,000 Fire Damage$5,000 Medical Expense
Umbrella/Excess Liability Insurance
$5 million All subcontractors must adhere to the same insurance and indemnification requirements. (Insurance Coverage please read pages 245-248 in Vol 1 of 2 Spec Book)
Architect in Charge: D&B Engineers and Architects Jennifer Gienau330 Crossways Park DriveWOODBURY, NY 11797(516) 364-9890
Construction Manager in Charge: TBA RFI Deadline – Friday Nov 7, 2025 at 12:00pm Questions must be sent via email to
[email protected] and
[email protected]
Project Location:Well No 15 & 18 - (Nassau)76 Dirt RoadWestbury, NY 11590
Prebid Walkthrough: A pre-bid meeting will be held at the project site located approximately at 76 Dirt Road Westbury, NY 11590 on Wednesday, November 5, 2025 at 10:00a.m. (Local Time). Please see Instructions to Bidders section for details.
Bid Break down Please include the below “Breakout Costs” for the following project components.
G-1 : Furnishing all labor, materials, equipment, and appurtenances to complete all work described under the General Construction Contract in the Contract Documents excluding the value of Bid Items 2 through 4 – Lump Sum Cost
G-3 : Additional work to excavate existing unsuitable materials beyond the lines and grades shown on the Plans and dispose of off-site in accordance with Specification Section 02200 as directed by the Owner/Engineer – Cost per a unit - 200 CY =
G-4 : Additional work to furnish, place and compact select fill imported from an off-site source to replace unsuitable materials excavated beyond the lines and grades shown on the Plans and in accordance with Specification Section 02200 as directed by the Owner/Engineer. – Cost per a unit - 200 CY =
Click THIS LINK for Dropbox to Plans and Specifications
Scope of Bid • Construction of the proposed GAC building foundation, floor slab and walls, doors, windows, and louvers • Installation of masonry block building, doors, windows, louvers, and associated HVAC equipment, heating systems and all accessories and appurtenances • Installation of GAC system and concrete foundation pads
Schedule Schedule After Official Award Tentative Contract Award: January 12, 2026 Submittals/Shop Drawings: Construction starts: 625 Consecutive Calendar Days after the date when the Contract Time Commence Substantial completion: Final Punch List/ Closeout:
Please contact Estimating at
[email protected] with any questions. Unfortunately, we are not always in the office. We will respond to ALL emails.
Patricia Estimating & Project Management Preferred Construction, Inc. 199 Broadway; Huntington Station, NY 11746 O: 631.385.5160 (CALLS ONLY) | M: 516.841.3443 (TEXTS ONLY) | F: 631.337.6000 www.preferredconstruct.com|
[email protected]
This message (including the attachments) may contain confidential, proprietary, privileged and/or private information. This information is intended to be for the use of the individual/s or entity designated above. If you are not the intended recipient/s of this message, please notify the sender immediately, and delete the message and any attachments. Any disclosure, reproduction, distribution or other use of this message or any attachments by an individual/s or entity other than the intended recipient/s is prohibited.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
Total MWBE Goals: 30.00%