Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›4-Inch Water Meter Installation

Missouri Department of Transportation Northeast District·Missouri

4-Inch Water Meter Installation

Closes 7/7/2026$50k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Missouri Department of Transportation Northeast District is seeking a qualified contractor to furnish and install a four-inch water meter and all necessary components for a complete and functional system at the New Florence Maintenance facility. The work will be located and performed at 540 Tree Farm Road, New Florence, MO 63363 in Montgomery County. The contractor shall connect a 4" water line to an existing 6" water main, install a new water meter and service vault, and provide a 12" capped 4" stub on the exterior of the vault for future connection. The contractor must guarantee all work and materials for a period of one year from the installation date. • The contractor shall provide a materials list for approval to MODOT before beginning work. • The contractor shall submit a list of subcontractors to MODOT. • The contractor shall coordinate the connection to the 6" main with the City of New Florence for correct connection procedures and pressure testing of all installed components. • The contractor shall seed and mulch any areas affected by excavation/groundwork after installation of the meter. • The contractor shall dispose of all waste materials and provide graded groundwork at the worksite.

Attached files

Contact

Bill Noyes(Senior Procurement Agent)

[email protected]

(660) 385-8245

Key dates

Opened
6/18/2026
Closes
7/7/2026
Duration
85 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
MODOT NE 0000000034SL

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a four-inch water meter, connection to an existing six-inch water main, and provision of a 12" capped 4" stub on the exterior of the vault. The cost of materials, labor, and equipment will influence the budget. Considering the project's complexity and the requirement for a guaranteed one-year warranty, the estimated budget could range from $50,000 to $200,000. Factors that may influence the likely payment range include the cost of materials, the number of workers required, and the equipment needed for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Rural Community Water District of Georgetown County·South Carolina

Top match · 70%

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

City of Bedford, TX·Texas

70% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Charlotte·North Carolina

69% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Massachusetts Town of Kingston·Massachusetts

67% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

LA County Internal Services Department·California

67% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

City of Boca Raton·Florida

67% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Georgia Jones County Board of Commissioners·Georgia

67% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

Arlington County Government·Virginia

67% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Aumsville·Oregon

66% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Holly Grove·Arkansas

66% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

City of Winnebago·Minnesota

66% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

LA Water & Power·California

65% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

City of Pasadena·California

65% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Boca Raton·Florida

65% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

LA Water & Power·California

65% match

146747 5/8"-1", Meter, Cold Water, Positive Displacement

Closes 11/12/2026Opened 10/29/2026

City of Phoenix·Arizona

65% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

City of Punta Gorda·Florida

64% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

The Ohio State University·Ohio

64% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Washington Suburban Sanitary Commission, MD·Maryland

64% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

City of Gould·Arkansas

64% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Connecticut Metropolitan District Commission·Connecticut

64% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Little Blue NRD·Nebraska

63% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Hilton Head Public Service District·South Carolina

63% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

Georgia City of Oxford·Georgia

63% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

The Metropolitan Water District of Southern California·California

63% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026