The City of Carrollton is soliciting sealed proposals for the construction of The Collective Off Rome Townhome Development Infrastructure Work Project. The project involves the demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. The contractor will be required to maintain good communication and coordination with the Project Engineer and City Engineer throughout the construction activity.
The proposal evaluation criteria include total bid price (50%) and quality of work and references (50%). The City reserves the right to reject any and all bids and to waive informalities, technicalities, or irregularities in the bids or contract documents.
Key aspects of the project:
• Demolition and removal of existing public sewer main and storm drainage networks
• Installation of proposed storm sewer networks (approximately 1900LF of pipe and 27 structures)
• Installation of sanitary sewer networks (approximately 1343 LF of pipe and 10 structures)
• Installation of public water main (approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters)
• Maintenance of good communication and coordination with the Project Engineer and City Engineer