Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›High Temp Hot Water Pipe Grouting/Abandonment North…

Central Florida Tourism Oversight District·Florida

High Temp Hot Water Pipe Grouting/Abandonment North Service Area Project - Phase II

Closes 12/15/2025$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Central Florida Tourism Oversight District is seeking proposals from experienced and qualified firms to permanently abandon the remaining sections of the High Temperature Hot Water (HTHW) hotel loop that services the Magic Kingdom Resort Area. The project requires the abandonment, sealing, and/or removal of all indicated piping and the restoration of any affected property in compliance with Reedy Creek Engineering Services (RCES)/Central Florida Tourism Oversight District (CFTOD)/Walt Disney World (WDW) requirements. The contractor will be responsible for verifying the "As-Found" conditions, identifying and providing any additional information required to complete the project, and providing the means and methods of construction along with a comprehensive project schedule. • The project involves abandoning and sealing high-temperature hot water pipes. • The contractor must verify the "As-Found" conditions and provide additional information as needed. • The project requires compliance with Reedy Creek Engineering Services (RCES)/Central Florida Tourism Oversight District (CFTOD)/Walt Disney World (WDW) requirements. • A mandatory site visit will be conducted on December 3, 2025, at 10:00 A.M. EST. • The contractor must provide the means and methods of construction and a comprehensive project schedule.

Attached files

Contact

Devin Ager(Procurement Analyst)

[email protected]

(407) 828-8199

Key dates

Opened
11/21/2025
Pre-bid meeting
12/3/2025Mandatory
Site visit
12/3/2025Mandatory
Closes
12/15/2025

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
RFP# C006979

Budget estimate

$500,000 – $2,000,000

The budget for this project is difficult to estimate without more information on the scope and complexity of the work. However, based on the fact that it involves abandoning and sealing high-temperature hot water pipes, the cost is likely to be in the range of $500,000 to $2 million. This estimate takes into account the cost of labor, materials, and equipment required for the project. Factors that may influence the budget include the length and complexity of the piping system, the need for specialized equipment or expertise, and the requirements for restoring affected property.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut UConn Health Center·Connecticut

Top match · 69%

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·North Carolina

67% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

Tarrant Regional Water District·Texas

67% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

North Carolina Southwestern Community College·North Carolina

67% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

Hawaii Community Development Authority·Hawaii

67% match

Honuakaha Hot Water Return Systems Modifications

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Agriculture·Minnesota

67% match

Superior NF Water Heater replacement

Closes 11/4/2026Opened 10/28/2026

New York State Energy Research and Development Authority·New York

67% match

Window Heat Pump Demonstration Program - Phase II

Closes 6/30/2027Opened 11/14/2025

Nevada Adjutant General·Nevada

66% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

NYSERDA·New York

66% match

Clean Heat for All: Packaged Terminal Heat Pump Program - Phase II

Closes 6/30/2027Opened 10/10/2025

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

Oregon Department of Administrative Services·Oregon

66% match

HVAC Water Treatment - Hot/Cold Water Systems Services for DAS-Owned Buildings

Closes 11/3/2026Opened 8/6/2026

Bristol Virginia Utilities Authority·Virginia

65% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of The Interior·Oklahoma

65% match

OK-DEEP FORK NWR-QUARTERS HVAC REPLACEM

Closes 11/11/2026Opened 10/29/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Branson·Missouri

65% match

RFP 2890-02 Fire Station 2 Radiant Heating System

Closes 11/4/2026Opened 10/5/2026

Alabama Bill Nichols State Veterans Home·Alabama

65% match

Nichols Hot Water Line Repair

Closes 11/5/2026Opened 10/28/2026

City of Hollywood·Florida

65% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

65% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·Washington

65% match

WSTF Tank Pipe Insulation

Closes 11/3/2026Opened 10/27/2026

Town of Eatonville·Florida

65% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Augusta, GA (Augusta Commission)·Georgia

65% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Horry Georgetown Technical College·South Carolina

65% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

University of Massachusetts System·Massachusetts

65% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

45--HEATER,WATER,ELECTRIC

Closes 11/8/2026Opened 10/28/2026