Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›House Street Pedestrian Bridge Replacement at Salmon Brook

Connecticut Town of Glastonbury·Connecticut

House Street Pedestrian Bridge Replacement at Salmon Brook

Closes 1/29/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Glastonbury is seeking bids for the replacement of the House Street Pedestrian Bridge at Salmon Brook. The project involves dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing, and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance, and aesthetic appeal. • The project is subject to the prevailing wage requirements of CT General Statutes Section 31-53. • Bidders are required to respond online at https://glastonburyct.bonfirehub.com/ under the bid title “GL-2026-18 – House Street Pedestrian Bridge Replacement at Salmon Brook”. • Bids must be accompanied by a bid security in the form of a Bid Bond, certified in an amount not less than 10% of the base bid.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Nicole Melquist

[email protected]

(860) 652-7588

Key dates

Opened
1/6/2026
Closes
1/29/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
GL-2026-18

Budget estimate

$500,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which involves dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing, and installing a replacement prefabricated pedestrian bridge superstructure. The cost of such a project can range from a few hundred thousand dollars to over a million dollars, depending on the complexity of the project, the materials used, and the labor costs. Assuming an average cost per project of this type, the budget could be estimated to be in the range of $500,000 to $1,500,000. Factors that may influence the likely payment range include the prevailing wage requirements, the cost of materials, and the complexity of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware River Joint Toll Bridge Commission·New Jersey

Top match · 66%

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Town of Pulaski·Virginia

65% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

City of Fremont·Ohio

64% match

Tiffin Street Bridge Replacement Project

Rolling / TBD closeOpened 9/29/2026

California Department of Transportation·California

64% match

Construct bridge structure for fish passage restoration.

Closes 12/3/2026Opened 10/12/2026

Connecticut Town Of Clinton·Connecticut

64% match

Replacement of Bridge No. 06956, Country Village Lane over Unnamed Brook

Closes 11/4/2026Opened 10/9/2026

Benewah County·Idaho

64% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

City of Seattle·Washington

64% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Meriden·Connecticut

63% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

U.S. Department Of Agriculture·California

63% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Newton·Kansas

63% match

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026Opened 10/14/2026

Connecticut Town of Cheshire·Connecticut

63% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

63% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Sacramento·California

63% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Connecticut Town of Cheshire·Connecticut

63% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Massachusetts Department of Transportation·Massachusetts

62% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

City of Alexandria·Louisiana

62% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

City of Melbourne·Florida

62% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

Connecticut City of New Britain·Connecticut

62% match

27-009 Willow Brook Park Pool Filter Replacement

Closes 11/24/2026Opened 10/30/2026

City of Prior Lake·Minnesota

62% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026