Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›FCC Lompoc - Replace Underground Water Reservoir &…

U.S. Department Of Justice·Texas

FCC Lompoc - Replace Underground Water Reservoir & De-Sludge and Re-Line Wastewater Pond #3

Closes 3/25/2026$1M – $5MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Federal Bureau of Prisons (FBOP) is seeking a qualified and licensed contractor to replace an underground water reservoir and de-sludge and re-line wastewater pond #3 at the Federal Correctional Complex (FCC) Lompoc in California. The project includes the demolition and removal of the existing concrete water storage tank, the design and construction of a new above-ground storage tank, and the de-sludging of wastewater pond #3. The contractor will also be required to install a new HDPE geomembrane liner system and provide a comprehensive 100% design package. • The project requires a maximum operational capacity of 660,000 gallons for the new water tank. • The contractor must provide all necessary equipment, labor, materials, and incidentals for the project. • The project is estimated to take 328 calendar days to complete. • The NAICS code for this project is 237110, which has a small business size standard of $45.0 million. • The estimated magnitude of the project is between $1,000,000 and $5,000,000.

Attached files

Contact

Jeffrey Kercheval

[email protected]

Key dates

Opened
3/18/2026
Closes
3/25/2026
Duration
328 days

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
237110
Solicitation №
15B61726PR000195

Budget estimate

$1,000,000 – $5,000,000

The estimated budget for this project can be estimated based on the estimated magnitude of the project, which is between $1,000,000 and $5,000,000. Considering the scope of work, which includes the replacement of an underground water reservoir and the de-sludging and re-lining of a wastewater pond, the budget is likely to be closer to the higher end of the estimate. Factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hollywood·Florida

Top match · 73%

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Massachusetts Dracut Water Supply District·Massachusetts

72% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

Manatee County - Purchasing Division·Florida

71% match

SEWRF 3rd Sludge Holding Tank

Closes 11/16/2026Opened 9/9/2026

City of Hollywood·Florida

70% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Eureka Springs·Arkansas

70% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

Upper Occoquan Service Authority·Virginia

70% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Maryland Department of Public Works·Maryland

70% match

WWTP Sludge Pad Replacement

Closes 11/5/2026Opened 9/29/2026

Town of Jupiter·Florida

70% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of The Interior·California

70% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

City of Lake City·Minnesota

70% match

Lake City, City of – WWTF UV Disinfection Replacement

Closes 11/5/2026Opened 10/16/2026

City of Fresno·California

69% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

City of Long Prairie·Minnesota

69% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Charlotte·North Carolina

69% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Santa Maria-Bonita School District·California

69% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

City of Hollywood·Florida

69% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Oregon Clackamas County·Oregon

69% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

California Grants·California

69% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

West County Wastewater·California

69% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

The Metropolitan Water District of Southern California·California

69% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/12/2026Opened 9/4/2026

City of DeLand·Florida

69% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026