The University of California Los Angeles is undertaking a renovation of the Acosta Operations Center to create a technical operations hub, including control rooms and a studio. Suffolk Construction, as the CM‑at‑Risk, is seeking pre‑qualified subcontractors for Paint, Wall Covering, and Fabric Wall Panel work (Bid Package 11). The scope covers interior painting, wall‑covering installation, fabric‑wrapped panels, acoustic wall panels, and related ceiling systems, all conforming to LEED‑ID+C and UC Fair Wage requirements. The estimated value of this package is $164,716 and only three pre‑qualified firms may submit bids. Bids must be uploaded through BuildingConnected, with three possible submission windows, the final being Oct 19 2026.
• Scope: Paint, surface preparation, priming, finish systems, felt‑ceiling cloud, wall covering, fabric‑wrapped and acoustic panels.
• Location: Acosta Training Center, 410 Charles E. Young Drive West, Westwood, CA (job‑walk at 342 Charles E Young Dr W).
• Requirements: California C‑33 contractor license, UC Fair Wage compliance, public‑work labor code adherence, and inclusion on the pre‑qualified list (Borbon, Inc.; GPS Painting & Wallcovering, Inc.; Valdez Painting, Inc.).