Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Pedestrian Safety - FRA-SRTS Sunbury/Agler

City of Columbus – Department of Public Service·Ohio

Pedestrian Safety - FRA-SRTS Sunbury/Agler

Closes 5/12/2026$1.2M – $3MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Columbus Public Service Department is seeking bids for a pedestrian‑safety improvement project on the Sunbury/Agler corridor. The work includes demolition of existing sidewalks, curbs, walls, and other roadway features, removal of trees and vegetation, excavation and embankment, installation of new concrete sidewalks, shared‑use paths, curb ramps, detectable warnings, erosion‑control measures, and final site cleanup. Bidders must be pre‑qualified ODOT contractors and provide a 10 % bid bond and adhere to a 6 % Small Business Enterprise (SBE) goal. • Demolition of existing roadway elements (curb, wall, sidewalk, trees) and removal of 1,178 SY of pavement, 430 FT of curb, 40 FT of wall, etc. • Installation of new 4‑in and 8‑in concrete walks, curb ramps (9 units), and detectable warning surfaces (≈ 180 SF). • Comprehensive erosion‑control, seeding, mulching, and topsoil placement (≈ 2,400 CY total earthwork). • Requirement for ODOT pre‑qualification, 10 % bid bond, and a minimum 6 % SBE participation. • All bid documents and addenda are hosted on BidExpress; hard copies are not accepted.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
4/14/2026
Questions due
4/28/2026
Closes
5/12/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
RFQ032612

Budget estimate

$1,200,000 – $3,000,000

The scope includes extensive demolition, 7,959 SF of new concrete walk, substantial earthwork, and multiple ancillary items. Based on typical municipal sidewalk/roadway rates in Ohio (approximately $150‑$250 per square foot for new concrete walk and $30‑$50 per cubic yard for earthwork), the total contract value is likely in the $1.2 M to $3.0 M range. Additional costs for labor, equipment, bonding, and SBE compliance could push the upper bound higher.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 68%

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

65% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Virginia Department of Transportation·Virginia

65% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Town of Westwood·Massachusetts

65% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Charlotte·North Carolina

65% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Seattle·Washington

64% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Central Ohio Transit Authority (COTA)·Ohio

64% match

Pedestrian and Collision Avoidance – ADAS Pilot Program

Closes 11/16/2026Opened 10/14/2026

City of Charlotte·North Carolina

64% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

City of Charlotte·North Carolina

63% match

Safe Streets for All (SS4A) Phase 1

Rolling / TBD closeOpened 4/1/2026

Nyc Department of Design and Construction·New York

63% match

85026B0094 - HWCSCHPQN - SAFE ROUTES TO SCHOOLS, QUEENS

Closes 11/9/2026Opened 6/22/2026

County of Stanislaus·California

62% match

Safe Streets and Roads for All Safety Action Plan and Planning Guidelines

Closes 11/19/2026Opened 10/21/2026

City and County of San Francisco·California

62% match

EXT MTA | Safe Routes to School Program

Closes 12/4/2026Opened 10/29/2026

City of San Diego·California

62% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Transportation·United States of America

62% match

USDOT Roadway Safety Innovation Expo (Safety Expo)

Closes 12/31/2026Opened 5/29/2026

City of Sunnyvale Procurement Bids and RFPs·California

62% match

Lakewood Safe Routes to School

Closes 11/18/2026Opened 10/23/2026

University of Georgia·Georgia

62% match

UGA Safety Shoe Program

Closes 11/11/2026Opened 10/19/2026

City of Sacramento·California

61% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Irving ISD·Texas

61% match

Purchase of Safety Footwear - FNS

Closes 11/17/2026Opened 10/7/2026

City of Rancho Cordova·California

61% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

Maryland State Highway Administration·Maryland

61% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Watsonville·California

61% match

Safe Streets for All (SS4A) Safety Action Plan

Closes 11/5/2026Opened 10/6/2026

City of Asbury Park·New Jersey

61% match

Notice to Bidders - BID Traffic Calming, Bike and Pedestrian Safety Upgrades

Closes 11/24/2026Opened 10/29/2026

Virginia Department of Transportation·Virginia

61% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

City of Charlotte·North Carolina

61% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Richmond Government·Virginia

61% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026