Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Engineering Services
  5. ›Wastewater Treatment Plants Influent Improvements…

City of Roseville·California

Wastewater Treatment Plants Influent Improvements Alternative Analyses

Closes 10/6/2026$300k – $600kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Roseville is soliciting qualified engineering firms to conduct a comprehensive alternatives analysis for influent improvements at its Dry Creek and Pleasant Grove Wastewater Treatment Plants. The study will evaluate headworks screening, pump capacity, flow‑shaving configurations, basin return pump station operations, and future headworks configuration, delivering a Preliminary Design Report with recommended alternatives and optional 10 % design development. • Scope covers data collection, alternative generation (up to 4 per issue), detailed analysis of up to 3 alternatives, cost and risk assessment, and a consolidated design report. • Optional 10 % design phase may be added for selected alternatives. • Project management, monthly reporting, and invoicing are required. • Pre‑proposal conference on Sep 9, 2026; final questions due Sep 23, 2026; proposal due Oct 6, 2026. • Award anticipated Dec 16, 2026 with services beginning Dec 17, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tracie Mueller(Bid Contact)

[email protected]

(916) 746-1854

Key dates

Opened
8/21/2026
Questions due
9/23/2026
Pre-bid meeting
9/9/2026
Closes
10/6/2026
Projected award
12/16/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
08-183

Budget estimate

$300,000 – $600,000

Based on typical municipal engineering studies of this complexity (two wastewater plants, multiple alternatives, data collection, and optional 10 % design), the contract value is likely in the mid‑hundreds of thousands. Assuming a senior engineer rate of $150‑$200/hr, a junior staff rate of $90‑$120/hr, and total effort of roughly 1,500‑2,500 hours (including management, analysis, reporting, and optional design), the estimated fee range would be approximately $300,000 to $600,000. Factors influencing the final amount include the optional 10 % design scope, any required sub‑consultants, and the depth of data collection required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Douglas·Wyoming

Top match · 67%

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Salisbury·Maryland

66% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Navajo Tribal Utility Authority·Arizona

66% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/21/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

66% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

City of Eureka Springs·Arkansas

66% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Palm Springs·California

66% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

City of Bismarck·North Dakota

66% match

Wastewater Treatment Plant Polymer IFB

Closes 11/3/2026Opened 8/11/2026

City of Austin·Texas

66% match

Davis Water Treatment Plant Filter System Improvements

Rolling / TBD closeOpened 10/2/2026

City of Ann Arbor·Michigan

65% match

Testing of Odor-Reducing Chemical Treatment for Municipal Sludge

Closes 11/18/2026Opened 10/22/2026

City of St. Joseph·Missouri

65% match

Wastewater Treatment Boiler Rebuild

Closes 11/11/2026Opened 10/26/2026

City of Decatur·Illinois

65% match

INVITATION TO BID - Influent Flume Repairs at South Water Treatment Plant

Closes 11/6/2026Opened 10/16/2026

City of Bakersfield·California

65% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

City of Douglas·Wyoming

65% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Franklin·Tennessee

65% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 11/4/2026Opened 10/8/2026

City of Charlotte·North Carolina

65% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Navajo Tribal Utility Authority·Arizona

65% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/28/2026

City of Austin·Texas

65% match

Pino Lane Wastewater Improvements

Rolling / TBD closeOpened 8/10/2026

City of Charlotte·North Carolina

65% match

McDowell WWTP UV Disinfection Improvements

Rolling / TBD closeOpened 2/1/2027

City of Grapevine·Texas

64% match

CMAR RAW WASTEWATER TREATMENT PLANT IMPROVEMENTS

Closes 11/19/2026Opened 10/21/2026

City of Hollywood·Florida

64% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Connecticut Town of Old Saybrook·Connecticut

64% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

City of Siloam Springs·Arkansas

64% match

WASTEWATER MASTER PLAN

Closes 11/20/2026Opened 10/18/2026

Navajo Tribal Utility Authority·Arizona

64% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/20/2026

Mississippi Department of Finance and Administration·Mississippi

64% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026