Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›W912HN25BA021 - Brunswick Entrance Channel Widener…

U.S. Department Of Defense·Georgia

W912HN25BA021 - Brunswick Entrance Channel Widener Dredging Project.

Closes 12/19/2025$1M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Army Corps of Engineers is seeking bids for the Brunswick Entrance Channel Widener Dredging Project. The project involves maintenance dredging of the entrance channel widener in Brunswick Harbor, Georgia. The contract will be awarded to the responsive and responsible, lowest-priced prospective contractor. The bidder must submit an electronic copy of the bid, including a bid bond guarantee, and provide a list of current contracts held, total dollar value, award date, anticipated completion, performance, and payment bond amount. The bidder must also acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended. Some key points to consider: • The contract will be a single firm fixed-price contract. • The bidder must submit an electronic copy of the bid, including a bid bond guarantee. • The bidder must provide a list of current contracts held, total dollar value, award date, anticipated completion, performance, and payment bond amount. • The bidder must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended. • A pre-bid conference will be held virtually on MS Teams on November 19, 2025, at 1:00 p.m. • There will not be a government-sponsored site visit, but prospective offerors are free to visit the site at their own discretion.

Attached files

Contact

Rohan Bryan(Contract Specialist)

[email protected]

(912) 652-5619

Key dates

Opened
9/26/2025
Pre-bid meeting
11/19/2025
Closes
12/19/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W912HN25BA021

Budget estimate

$1,000,000 – $10,000,000

The budget for this project can be estimated based on the scope of work and the type of contract. Since it is a single firm fixed-price contract, the budget will be a lump sum. The project involves maintenance dredging of the entrance channel widener in Brunswick Harbor, Georgia, which may require significant resources and equipment. Considering the complexity of the project and the requirements for the bidder, a rough estimate for the budget could be between $1 million and $10 million. The actual budget will depend on the bids received and the contractor's ability to complete the project within the specified timeframe and budget. Factors that may influence the likely payment range include: - The scope of work, including the amount of dredging required and the complexity of the project. - The type of equipment and resources required to complete the project. - The bidder's experience and reputation in completing similar projects. - The level of competition among bidders. - The government's budget for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 76%

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Virginia

75% match

Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

75% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Mississippi

74% match

W912EE27BA002 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ Waterway

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

74% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 9/11/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Texas

74% match

FY27 Texas City Ship Channel Main Channel and Turning Basin

Closes 11/7/2026Opened 10/28/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Georgia

74% match

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

73% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

U.S. Department Of Defense·Louisiana

73% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/3/2026

U.S. Department Of Defense·Louisiana

73% match

Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA

Closes 4/7/2028Opened 3/23/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

Brunswick County·North Carolina

73% match

ITB: Ocean Ridge Reclaimed Waterline

Closes 11/19/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

72% match

New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025

Closes 6/12/2027Opened 6/12/2025