Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Power Lane II and GNIN Substations

Greenville Electric Utility·Texas

Power Lane II and GNIN Substations

Closes 9/10/2026$5M – $15MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Greenville Electric Utility System (GEUS) is seeking qualified firms to design, furnish, deliver, and construct the Power Lane II Switchyard and modify the GNIN Switchyard in Greenville, Texas. The scope includes all labor, materials, and equipment necessary for construction, with GEUS providing certain listed items. Exclusions are testing and commissioning, which will be handled in a separate bid. The contractor will manage fiber terminations (except splice boxes), temporary job‑site power installation, control‑cable terminations, and material transport/unloading. Coordination for outages and live‑switchyard work is required. A non‑mandatory pre‑bid meeting and site visit are scheduled, and questions must be submitted by 31 August 2026. Proposals are due 10 September 2026. • Construction of Power Lane II Switchyard and modifications to GNIN Switchyard • Provide all labor, materials, equipment (except GEUS‑furnished items) • Excludes testing & commissioning (separate contract) • Responsibility for fiber terminations, control‑cable terminations, and temporary power setup • Must coordinate outages with GEUS and work in live switchyard environment • Deliver and unload GEUS‑provided materials; transport additional materials as required • Pre‑bid meeting 12 Aug 2026 (optional); site visit same day • Questions due 31 Aug 2026; proposal deadline 10 Sep 2026 • Award expected 24 Sep 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kodi Hickman(Purchasing Agent)

[email protected]

(903) 457-2830

Key dates

Opened
8/5/2026
Questions due
8/31/2026
Pre-bid meeting
8/12/2026
Site visit
8/12/2026
Closes
9/10/2026
Projected award
9/24/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237130
Solicitation №
25-26-29 Addendum 3

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a contract value. Based on typical costs for building a medium‑size substation (including civil works, equipment, installation, and coordination), similar projects in Texas range from roughly $5 million to $15 million. The estimate varies with design complexity, material prices, and scope of GEUS‑furnished items.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Los Angeles County Sanitation Districts·California

Top match · 64%

ELECTRICAL SERVICE AND SWITCHGEAR INSTALLATION — A. K. WARREN FACILITY BIOGAS CONDITIONING SYSTEM-2 (BCS-2)

Closes 11/16/2026Opened 10/20/2026

Power Authority of New York·New York

63% match

Natural Gas Transportation- Astoria Energy II Power Plant

Closes 12/31/2026Opened 3/27/2024

NYS Rochester-Genesee Reg. Transportation Authority·New York

62% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

City of Gallup·New Mexico

62% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

Grand River Dam Authority - GRDA·Oklahoma

62% match

Tonnece 69 kV Terminal Addition Project - Substation & Transmission

Closes 11/20/2026Opened 10/26/2026

Power Authority of New York·New York

61% match

Natural Gas Transportation -500MW Power Plant, Astoria, New York

Closes 12/31/2026Opened 3/27/2024

Iowa State University·Iowa

61% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

Calhoun County Board of County Commissioners·Florida

61% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Imperial Irrigation District·California

61% match

Construction Services for Protection Relays Replacement Programs

Closes 11/24/2026Opened 9/29/2026

City of Lodi·California

61% match

Electric Utility- 230/60kV Auto Transformers

Closes 12/18/2026Opened 10/15/2026

California Department of Forestry and Fire Protection·California

60% match

IFB 9CA07882 - Underground Electrical Power Infrastructure Installation

Closes 11/18/2026Opened 9/16/2026

City of Richland·Washington

60% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

NYS MTA - Metro-North Railroad·New York

60% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

Power Authority of New York·New York

60% match

Natural Gas Transportation- Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

Louisiana Jefferson Parish Purchasing Department·Louisiana

60% match

Avondale South Lift Station Generator & Avondale North Lift Station

Closes 11/19/2026Opened 10/7/2026

NYS Brookhaven, Town of·New York

60% match

Installation of Generators at Various Town Locations

Closes 11/13/2026Opened 10/26/2026

U.S. Department Of Veterans Affairs·Pennsylvania

60% match

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC

Closes 11/20/2026Opened 10/23/2026

Utility Board of the City of Key West·Florida

60% match

KEYS Bid 23-26 Specifications for Kennedy Drive Substation Bus Replacement

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Energy·Tennessee

60% match

Grid Research Innovation and Development Center Technology Collaborations for US Power Electronics Industries

Closes 8/2/2029Opened 8/2/2024

U.S. Department Of Defense·California

59% match

61--POWER SUBSTATION,EL

Closes 11/5/2026Opened 10/29/2026

KC Board of Public Utilities·Kansas

59% match

Nearman N1 Generator Step Up Transformer

Closes 12/11/2026Opened 9/25/2026

City of Pinole·California

59% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

Power Authority of New York·New York

59% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

Department of Administrative Services·Iowa

59% match

Electrical Services - Zone 3

Closes 11/19/2026Opened 10/19/2026

Los Angeles County Public Works·California

59% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026