The US Air Force is seeking sources to replace site lighting electrical conduits at 5 launch facilities in Nebraska and Wyoming. The project involves removing existing conduits, installing new ones, and connecting new wires to ensure proper operation of the site lighting system. The contractor will be responsible for providing all labor, materials, equipment, and transportation necessary for the project. The project is expected to last 120 calendar days.
• The contractor will remove wire from existing failed conduit and install new one-and-one-half inch PVC coated rigid conduit.
• The contractor will pull new wire through the new conduit and properly connect circuit to ensure proper operation of the site light system.
• The contractor will backfill conduit trench in maximum of six-inch loose lifts and apply compactive effort until soil is firm and tight.
• The contractor will provide weekly project updates and hold project meetings as needed to coordinate project activities with the CO and 90 CES/CEM.