The opportunity involves adding a UPS system to a server, including a 25kW UPS unit, internal battery strings, and an Emergency Power Off button. The main purpose of the UPS is to run between power outage and when the generator kicks on, which should be less than 30 seconds. The current load of the server racks is about 30kW, and quotes for both a 20kVA or 30kVA UPS are requested.
• The UPS system should include a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal.
• An Emergency Power Off button is required.
• The bypass switch does not need to be in a separate cabinet, and a panel with similar features is acceptable.
• No exact location has been designated for the EPO installation, and the best fit and less expense are preferred.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.