Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Water and Wastewater
  5. ›Voll/Stanley/Larry/Joe/Martha/Petri/ Water Main Replacement

City of Cincinnati·Ohio

Voll/Stanley/Larry/Joe/Martha/Petri/ Water Main Replacement

Closes 2/25/2026$1.2M – $1.6MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cincinnati is soliciting bids for a comprehensive water‑main replacement project across the Voll, Stanley, Larry Joe, Martha, Petri, and Tallbery corridors. The scope includes furnishing and installing ductile‑iron and copper water‑main pipes, associated fittings, valve boxes, fire‑hydrant relocation and flow testing, traffic‑control planning, excavation, and related civil works. An optional plumbing package covers private‑lead‑service‑line replacement where homeowner agreements exist, with a $1,500 allowance per line and required 100 % surety. Bidders must submit unit‑price bids, a 10 % bid bond, and a performance bond equal to the contract value, and comply with Davis‑Bacon wage rules, M/WBE goals, and numerous safety and environmental regulations. • Provides 6‑in. and 8‑in. ductile‑iron pipe (≈ 4,419 LF total) and copper service pipe (≈ 1,499 LF). • Includes fire‑hydrant relocation, flow testing, valve‑box installation, and full traffic‑control/roadway restoration. • Optional private‑lead‑service‑line replacement (allowance $1,500 per line) with mandatory surety and homeowner agreement.

Attached files

Contact

Alexa Kafury(Buyer)

[email protected]

Key dates

Opened
9/1/2021
Questions due
2/11/2026
Closes
2/25/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
263C909230

Budget estimate

$1,200,000 – $1,600,000

The unofficial bid totals in the provided spreadsheets range from roughly $1.25 M to $1.5 M for the general‑construction package, with an additional $1,500 allowance per private lead‑service line. Considering typical contractor mark‑ups, material costs, and contingency allowances, a realistic award amount likely falls between $1.2 million and $1.6 million. The lower bound assumes minimal lead‑line work and lean labor rates; the upper bound reflects full utilization of the water‑main quantities, higher labor rates, and potential change‑order escalations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Western Virginia Water Authority·Virginia

Top match · 67%

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Bellevue·Washington

66% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Ontario·California

66% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Charlotte·North Carolina

65% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Oregon Tualatin Valley Water District·Oregon

65% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Agriculture·Utah

65% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

New York City Department of Design and Construction·New York

65% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

Clermont County - Board of Commissioners·Ohio

65% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Edgewater, FL·Florida

65% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of DeLand·Florida

64% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Massachusetts Town of Plymouth·Massachusetts

64% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

City of Waukegan·Illinois

64% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Hastings Utilities·Nebraska

64% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

U.S. Department Of Veterans Affairs·Missouri

64% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

Metropolitan Council·Minnesota

64% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

New York City Department of Design and Construction·New York

64% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Anderson, SC·South Carolina

64% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

Gwinnett County Government·Georgia

64% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

Gwinnett County Government·Georgia

64% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

Goodwyn Mills Cawood·Georgia

64% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Gwinnett County Government·Georgia

63% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

City of Redlands·California

63% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Holly Grove·Arkansas

63% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

New York City Department of Design and Construction·New York

63% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026