The City of Cincinnati is soliciting bids for a comprehensive water‑main replacement project across the Voll, Stanley, Larry Joe, Martha, Petri, and Tallbery corridors. The scope includes furnishing and installing ductile‑iron and copper water‑main pipes, associated fittings, valve boxes, fire‑hydrant relocation and flow testing, traffic‑control planning, excavation, and related civil works. An optional plumbing package covers private‑lead‑service‑line replacement where homeowner agreements exist, with a $1,500 allowance per line and required 100 % surety. Bidders must submit unit‑price bids, a 10 % bid bond, and a performance bond equal to the contract value, and comply with Davis‑Bacon wage rules, M/WBE goals, and numerous safety and environmental regulations.
• Provides 6‑in. and 8‑in. ductile‑iron pipe (≈ 4,419 LF total) and copper service pipe (≈ 1,499 LF).
• Includes fire‑hydrant relocation, flow testing, valve‑box installation, and full traffic‑control/roadway restoration.
• Optional private‑lead‑service‑line replacement (allowance $1,500 per line) with mandatory surety and homeowner agreement.