The County is seeking a qualified contractor to replace the existing cooling tower, chiller, pumps, and associated mechanical, electrical, and plumbing systems at the Missoula County Detention Facility, including the installation of new groundwater supply and injection wells. The scope includes demolition of existing equipment, installation of a new water‑cooled chiller (optional alternate), new hydronic piping, heat exchangers, control systems, and all required electrical work, as well as testing, commissioning, and warranty provision.
• Demolition of existing cooling tower, boiler, chiller, pumps, and related infrastructure.
• Installation of a new water‑cooled chiller, hydronic pumps, flat‑plate heat exchangers, glycol feeder, and control systems.
• Drilling and development of supply and injection groundwater wells with buried piping, plus associated pressure‑testing and documentation.
• Comprehensive electrical upgrades, including new breakers, VFDs, and compliance with NEC and Montana codes.
• Project must meet prevailing‑wage, insurance, bonding, and warranty requirements; work to be completed by 14 May 2027.