The County is seeking a qualified contractor to fully upgrade Sewage Pump Station 304. The scope covers demolition of existing dry‑ and wet‑well structures, removal of pumps, valves, electrical equipment, installation of new mechanical and electrical systems, construction of new concrete pads and walls, tree protection, temporary fencing, utility coordination, and full site restoration. The project must be completed within a 360‑day schedule and includes strict environmental (asbestos/lead) and permitting requirements.
• Complete civil work: excavation, demolition, backfill with flowable fill, new concrete structures, asphalt driveway.
• Mechanical/electrical installation: new submersible pumps, 50 kW generator, control panels, SCADA, conduit, valve boxes, and related piping.
• Compliance duties: asbestos/lead handling, EPA/OSHA safety, Sunshine 811 utility locate, SFWMD temporary access permit, public‑works road permits, and tree‑protection barriers.