The San Diego County Regional Airport Authority is procuring a fixed‑price contract to retrofit 36 single‑family residences surrounding San Diego International Airport under the Quieter Home Program Phase 14 Group 8. The work focuses on sound‑attenuation upgrades, including high‑performance window and exterior‑door replacement, detailed finish carpentry, HVAC/ventilation and related electrical upgrades, and demolition/modification of existing structures with temporary weather‑proof closures. The contract is federally funded (FAA AIP) and requires compliance with prevailing‑wage rules, Buy‑American provisions, EPA Renovation Firm certification, and a California Class B contractor license; any asbestos work must be performed by a contractor holding the Section 7058.6 asbestos license. Up to 67 % of the work may be subcontracted, with a minimum 33 % performed by the prime. The project value is approximately $1.82 M, with a 276‑day performance period starting after an anticipated Notice to Proceed in August 2026.
• Replace acoustically‑rated windows, exterior doors, and secondary glazing on 36 dwellings.
• Perform detailed finish carpentry, HVAC/ventilation upgrades, and associated electrical work.
• Conduct demolition, structural modifications, temporary weather‑proofing, and any required asbestos/lead‑paint abatement.
• Meet federal (FAA), state (California), and local (San Diego) regulations, including Davis‑Bacon prevailing‑wage, Buy‑American, EPA Renovation Firm, and DBE requirements.
• Provide complete close‑out documentation (as‑built drawings, O&M manuals, warranties) and adhere to liquidated‑damage penalties for schedule overruns.